    Complete fuzzy scheduling and fuzzy earned value management in construction projects

    Full text link
    Complete fuzzy scheduling and fuzzy earned value management in construction projects Por: Luis Ponz-Tienda, Jose; Pellicer, Eugenio; Yepes, Victor JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A Volumen: 13 Número: 1 Páginas: 56-68 Fecha de publicación: JAN 2012 Search For Full Text Cerrar abstractCerrar abstract This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value. It goes a step further than the existing literature: in the formulation of the fuzzy earned value we consider not only its duration, but also cost and production, and alternatives in the scheduling between the earliest and latest times. The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers. Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology. The proposed model allows for controlling the vagueness of the environment through the adjustment of the alpha-cut, adapting it to the specific circumstances of the project. © Zhejiang University and Springer-Verlag Berlin Heidelberg 2012.The authors want to thank Ms. Doria GIL-SENABRE, Universitat Politecnica de Valencia, Spain, for the support provided.Ponz Tienda, JL.; Pellicer Armiñana, E.; Yepes Piqueras, V. (2012). Complete fuzzy scheduling and fuzzy earned value management in construction projects. Journal of Zhejiang University Science A. 13(1):56-68. https://doi.org/10.1631/jzus.A1100160S566813

    Multi-objective optimization design of bridge piers with hybrid heuristic algorithms

    Full text link
    This paper describes one approach to the design of reinforced concrete (RC) bridge piers, using a three-hybrid multiobjective simulated annealing (SA) algorithm with a neighborhood move based on the mutation operator from the genetic algorithms (GAs), namely MOSAMO1, MOSAMO2 and MOSAMO3. The procedure is applied to three objective functions: the economic cost, the reinforcing steel congestion and the embedded CO2 emissions. Additional results for a random walk and a descent local search multi-objective algorithm are presented. The evaluation of solutions follows the Spanish Code for structural concrete. The methodology was applied to a typical bridge pier of 23.97 m in height. This example involved 110 design variables. Results indicate that algorithm MOSAMO2 outperforms other algorithms regarding the definition of Pareto fronts. Further, the proposed procedure will help structural engineers to enhance their bridge pier designs. © Zhejiang University and Springer-Verlag Berlin Heidelberg 2012.Project supported by the Spanish Ministry of Science and Innovation (No. BIA2011-23602), and the European Community with the European Regional Development Fund (FEDER), SpainMartínez Martín, FJ.; González Vidosa, F.; Hospitaler Pérez, A.; Yepes Piqueras, V. (2012). Multi-objective optimization design of bridge piers with hybrid heuristic algorithms. Journal of Zhejiang University Science A. 13(6):420-432. https://doi.org/10.1631/jzus.A1100304S42043213
    corecore