4,700 research outputs found

    Review of the Lightning Strike Incident at Launch Complex 37 on July 27, 1967, and Comparison to a Gemini Lightning Strike

    Get PDF
    The Launch Complex 37 lightning strike of July 27, 1967, was reviewed and compared to a similar incident on the Gemini Program. Available data indicate little likelihood of damaging currents having been present in SA-204 Launch Vehicle or the ground equipment during the July 27th incident. Based on the results of subsystem and system testing after the strike, anticipated results of future testing, the six months elapsed time between the strike-and launch, and the fact that much of the critical airborne electrical/electronic equipment has been removed since the strike for other reasons, no new actions are considered necessary at this time in the Gemini case, significant failures occurred in both airborne and ground circuits. Due to the resultant semi, condlictor uncertainty, and the relatively' short time prior to planned launch, all critical airborne components containing semiconduetors were replaced, and a sophisticated data comparison task was implemented

    Adding Resistances and Capacitances in Introductory Electricity

    Get PDF
    We propose a unified approach to addition of resistors and capacitors such that the formulae are always simply additive. This approach has the advantage of being consistent with the intuition of the students. To demonstrate our point of view, we re-work some well-known end-of-the-chapter textbook problems and propose some additional new problems.Comment: 13 pages, LaTeX, uses additional packages, 7 eps figures; one comment added after the truncated-cone resisto

    Acceptability of artificial intelligence (AI)-enabled chatbots, video consultations and live webchats as online platforms for sexual health advice

    Get PDF
    Objectives Sexual and reproductive health (SRH) services are undergoing a digital transformation. This study explored the acceptability of three digital services, (i) video consultations via Skype, (ii) live webchats with a health advisor and (iii) artificial intelligence (AI)-enabled chatbots, as potential platforms for SRH advice. Methods A pencil-and-paper 33-item survey was distributed in three clinics in Hampshire, UK for patients attending SRH services. Logistic regressions were performed to identify the correlates of acceptability. Results In total, 257 patients (57% women, 50% aged <25 years) completed the survey. As the first point of contact, 70% preferred face-to-face consultations, 17% telephone consultation, 10% webchats and 3% video consultations. Most would be willing to use video consultations (58%) and webchat facilities (73%) for ongoing care, but only 40% found AI chatbots acceptable. Younger age (<25 years) (OR 2.43, 95% CI 1.35 to 4.38), White ethnicity (OR 2.87, 95% CI 1.30 to 6.34), past sexually transmitted infection (STI) diagnosis (OR 2.05, 95% CI 1.07 to 3.95), self-reported STI symptoms (OR 0.58, 95% CI 0.34 to 0.97), smartphone ownership (OR 16.0, 95% CI 3.64 to 70.5) and the preference for a SRH smartphone application (OR 1.95, 95% CI 1.13 to 3.35) were associated with video consultations, webchats or chatbots acceptability. Conclusions Although video consultations and webchat services appear acceptable, there is currently little support for SRH chatbots. The findings demonstrate a preference for human interaction in SRH services. Policymakers and intervention developers need to ensure that digital transformation is not only cost-effective but also acceptable to users, easily accessible and equitable to all populations using SRH services

    Lunar base mission technology issues and orbital demonstration requirements on space station

    Get PDF
    The International Space Station has been the object of considerable design, redesign, and alteration since it was originally proposed in early 1984. In the intervening years the station has slowly evolved to a specific design that was thoroughly reviewed by a large agency-wide Critical Evaluation Task Force (CETF). As space station designs continue to evolve, studies must be conducted to determine the suitability of the current design for some of the primary purposes for which the station will be used. This paper concentrates on the technology requirements and issues, the on-orbit demonstration and verification program, and the space station focused support required prior to the establishment of a permanently manned lunar base as identified in the National Commission on Space report. Technology issues associated with the on-orbit assembly and processing of the lunar vehicle flight elements are also discussed
    corecore