6 research outputs found

    Evaluation of pressurized water cleaning systems for hardware refurbishment

    Get PDF
    Historically, refurbishment processes for RSRM motor cases and components have employed environmentally harmful materials. Specifically, vapor degreasing processes consume and emit large amounts of ozone depleting compounds. This program evaluates the use of pressurized water cleaning systems as a replacement for the vapor degreasing process. Tests have been conducted to determine if high pressure water washing, without any form of additive cleaner, is a viable candidate for replacing vapor degreasing processes. This paper discusses the findings thus far of Engineering Test Plan - 1168 (ETP-1168), 'Evaluation of Pressurized Water Cleaning Systems for Hardware Refurbishment.

    Implementation of environmentally compliant cleaning and insulation bonding for MNASA

    Get PDF
    Historically, many subscale and full-scale rocket motors have employed environmentally and physiologically harmful chemicals during the manufacturing process. This program examines the synergy and interdependency between environmentally acceptable materials for solid rocket motor insulation applications, bonding, corrosion inhibiting, painting, priming, and cleaning, and then implements new materials and processes in subscale motors. Tests have been conducted to eliminate or minimize hazardous chemicals used in the manufacture of modified-NASA materials test motor (MNASA) components and identify alternate materials and/or processes following NASA Operational Environmental Team (NOET) priorities. This presentation describes implementation of high pressure water refurbishment cleaning, aqueous precision cleaning using both Brulin 815 GD and Jettacin, and insulation case bonding using ozone depleting chemical (ODC) compliant primers and adhesives

    A randomized trial of planned cesarean or vaginal delivery for twin pregnancy

    No full text
    Background: Twin birth is associated with a higher risk of adverse perinatal outcomes than singleton birth. It is unclear whether planned cesarean section results in a lower risk of adverse outcomes than planned vaginal delivery in twin pregnancy.\ud \ud Methods: We randomly assigned women between 32 weeks 0 days and 38 weeks 6 days of gestation with twin pregnancy and with the first twin in the cephalic presentation to planned cesarean section or planned vaginal delivery with cesarean only if indicated. Elective delivery was planned between 37 weeks 5 days and 38 weeks 6 days of gestation. The primary outcome was a composite of fetal or neonatal death or serious neonatal morbidity, with the fetus or infant as the unit of analysis for the statistical comparison.\ud \ud Results: A total of 1398 women (2795 fetuses) were randomly assigned to planned cesarean delivery and 1406 women (2812 fetuses) to planned vaginal delivery. The rate of cesarean delivery was 90.7% in the planned-cesarean-delivery group and 43.8% in the planned-vaginal-delivery group. Women in the planned-cesarean-delivery group delivered earlier than did those in the planned-vaginal-delivery group (mean number of days from randomization to delivery, 12.4 vs. 13.3; P = 0.04). There was no significant difference in the composite primary outcome between the planned-cesarean-delivery group and the planned-vaginal-delivery group (2.2% and 1.9%, respectively; odds ratio with planned cesarean delivery, 1.16; 95% confidence interval, 0.77 to 1.74; P = 0.49).\ud \ud Conclusion: In twin pregnancy between 32 weeks 0 days and 38 weeks 6 days of gestation, with the first twin in the cephalic presentation, planned cesarean delivery did not significantly decrease or increase the risk of fetal or neonatal death or serious neonatal morbidity, as compared with planned vaginal delivery
    corecore