7 research outputs found

    Motorized Regulation Systems for the SARAF Project

    No full text
    International audienceCEA is in charge of the tuning regulation systems for the SARAF-Linac project. These tuning systems will be used with LLRF to regulate the 3 Rebuncher cavities and the HWR cavities of the 4 cryomodules. These systems were already tested on the Rebuncher and Equipped Cavity Test stands to test respectively the warm and cold tunings. This paper describes the hardware and software architectures. Both tuning systems are based on Siemens PLC and EPICS-PLC communication. Ambiant temperature technology is based on SIEMENS motor controller solution whereas the cold one combines Phytron and PhyMOTION solutions

    SARAF Equipped Cavity Test Stand (ECTS) at CEA

    No full text
    International audienceCEA is committed to delivering a Medium Energy Beam Transfer line and a Super Conducting Linac (SCL) for SARAF accelerator in order to accelerate 5mA beam of either protons from 1.3MeV to 35MeV or deuterons from 2.6 MeV to 40.1MeV. The SCL consists in 4 cryomodules separated by warm section housing beam diagnostics. The two first identical cryomodules hosts respectively 6 and 7 half-wave resonator (HWR) low beta (0.091) cavities 176MHz. In order to test the cavity with its tuner and coupler and validate some design consideration, the Equipped Cavity Test Stand (ECTS) has been designed and will be presented

    Results of CEA Tests of SARAF Couplers Prototypes

    No full text
    International audienceCEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5 mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The SCL consists in 4 cryomodules. The first two cryomodules host 6 and 7 half-wave resonator (HWR) low beta cavities (β = 0.09) at 176 MHz. The last two identical cryomodule will host 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The maximal required power to be transmitted to the beam is 11.4 kW for high-beta cavity couplers. This document presents the results of the coupler tests and conditioning

    Evolution Based on MicroTCA and MRF Timing System

    No full text
    International audienceFor many years our Institute CEA IRFU has had a sound experience in VME and EPICS. For the accelerator projects SPIRAL2 at Ganil in Normandy and IFMIF/LIPAc at JAEA/Rokkasho (Japan) the EPICS control systems were based on VME. For 5 years our Institute has been involved in several in-kind collaboration contracts with ESS. For the first contracts (ESS test stands, Source and LEBT controls) ESS recommended us to use VME based solutions on IOxOS boards. Our close collaboration with ESS, their support and the requirements for new projects have led us to develop a standardized hardware and software platform called IRFU EPICS Environment based on microTCA.4 and MRF timing system. This paper describes the advantages of the combination of these recent technologies and the local control system architectures in progress for the SARAF project

    Study and test of the rebuncher for SARAF-LINAC phase II

    No full text
    International audienceIn order to match the beam exiting the RFQ to the superconducting cavities and to minimize the longitudinal beam extension, three rebunchers will be installed in the Medium Energy Beam Transport (MEBT) of SARAF-LINAC phase II. CEA is in charge of the design and fabrication of the copper-plated stainless steel, 3-gap rebunchers. Beam dynamic simulation leads to the global MEBT design. The rebuncher was successfully conditioned to the RF power of 4.4 kW required for CW operation, with sufficient power margin. A solid state power amplifier of 10 kW developed by SNRC is used during the RF test. The rebuncher shows a good performance in terms of the dissipated power, peak temperatures and vacuum level

    RF Power Test of the Rebuncher for Saraf-Linac

    No full text
    International audienceThree normal conducting rebunchers will be installed at the Medium Energy Beam Transport (MEBT) of the SARAF-LINAC phase II [saraf]. The MEBT line is designed to follow a 1.3 MeV/u RFQ, is about 5 m long, and contains three 176 MHz rebunchers providing a field integral of 10⁵ kV. CEA is in charge of the design and fabrication of the Cu plated stainless steel, 3-gap rebuncher. The high power tests and RF conditioning have been successfully performed at the CEA Saclay on the first cavity. A solid state power amplifier, which has been developed by SNRC and has been used for the RF tests. The cavity has shown a good performance according to calculations, regarding the dissipated power, peak temperatures and coupling factor. RF conditioning was started with a duty cycle of 1\% and increased gradually until continuous wave (CW), which is the nominal working mode in SARAF-LINAC

    Status of the SARAF-Phase2 Control System

    No full text
    International audienceSNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 Mev deuteron and proton beams and also closely to the control system. CEA is in charge of the Control System (including cabinets) design and implementation for the Injector (upgrade), MEBT and Super Conducting Linac made up of 4 cryomodules hosting HWR cavities and solenoid packages. This paper gives a detailed presentation of the control system architecture from hardware and EPICS software points of view. The hardware standardization relies on MTCA.4 that is used for LLRF, BPM, BLM and FC controls and on Siemens PLC 1500 series for vacuum, cryogenics and interlock. CEA IRFU EPICS Environment (IEE) platform is used for the whole accelerator. IEE is based on virtual machines and our MTCA.4 solutions and enables us to have homogenous EPICS modules. It also provides a development and production workflow. SNRC has integrated IEE into a new IT network based on advanced technology. The commissioning is planned to start late summer 2021
    corecore