7 research outputs found
Volume II
2 volumes; approximately 500-600 pages eachThis document defines the scope of this sampling project as understood by ENSR and EH&A, and represents the Quality Assurance Project Work Plan. This plan includes a discussion of the the project objectives, project schedule, project tasks, and project organization
Firestone, Orange, Texas - Health Risk Assessment
450? pgs.Beginning in 1984, Bridgestone/Firestone, Inc. contracted with ENSR Consulting and Engineering to evaluate and identify the most cost-effective means of characterizing and resolving the diverse environmenal issues at their chemical plant located in Orange, Texas. This facility comprises approximately 336 acres and has been in continuous operation since 1957. Since 1980, a total of 47 areas have been identified in various lists and regulatory submissions as possible waste management sites. Eight of these appear to have been listed in error (reflecting anticipated activities which were never initiated). At the remaining 39 areas, ENSR's field teams have sampled selected soil, sediment, surface water, and groundwater for chemical analysis. For purposes of risk analysis, analytical data are considered to be adequate for 10 water management areas (Note: ENSR continues to characterize the other waste management areas). Eight additional areas were identified where contamination might have occurred due to surface water runoff and/or leaching of contaminants, and where there was potential for significant human exposures. Soil, water, fish tissue, and crab tissue were analyzed for specific chemical constituents in these additional areas. In addition, 2 clean areas were sampled as a reference, one on the northern plant border and one on the southern plant border. This gives a total of 20 areas evaluated; 10 waste management units; 8 additional areas, and reference areas. On the basis of non-cancer health risks, 12 of the 20 areas were determined to have contaminants at concentrations resulting in Hazard Indices greater than one, and must be considered further with regard to appropriate remedy. Seven of the 20 areas were determined to have carcinogens present at levels resulting in Cancer Indices greater than zero, and must be considered further with regard to appropriate remedy. Nine of the 20 areas were found to have no contaminants at levels of health concern and have not been listed in Table E-1. From a health point-of-view, ENSR believes that it would be both resource-wasteful and fiscally inappropriate for these areas to be given further attention by wither Firestone/Bridgeston or by regulatory authorities.http://gbic.tamug.edu/request.ht
Interim Assessment Houston Ship Channel
Approximately 300 pagesThe Interim Assessment is presented in the following five sections as follows: Section 1 - Explanation of Graphs; Section 2 - Dioxin Analysis; Section 3 - Sediment Analysis; Section 4 - Water Analysis; Section 5 - Data. Two significant data sets were not available when the graphs presented herein were prepared - metals for water and the December temporal water sampling. ENSR anticipates that the final report, prepared July 1994, will present the total data in a manner similar to the graphs presented herein, subject to approval by the Oversight Committee. Manyof the graphs have been prepared with the thought of adding data from future analyses
Volume II - Appendices D-J
2 volumes; approximately 200 pages each.Appendices to the Houston Ship Channel Toxicity Study Project Report
Environmental Assessment: Salt River Project Agricultural Improvement and Power District (SRP): Kyrene Expansion Project: Tempe, Arizona
SRP is proposing to construct, own, and operate the Kyrene Expansion Project (KEP), which would expand the energy producing capacity of its existing Kyrene Generating Station in Tempe, Arizona. The proposed facility would consist of one natural gas-fired combined cycle system (stationary combustion turbine, stationary steam turbine, and heat recovery steam generator [HRSG]); one diesel-fired emergency fire water pump; one mechanical draft cooling tower; and associated water supply, water discharge, and natural gas pipelines.
