    EMP Attachment 2 DOE-SC PNNL Site Data Management Plan

    Get PDF
    This Data Management Plan (DMP) describes the data management processes and activities under the Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan. The activities currently in the Plan are limited to offsite environmental surveillance of PNNL Site radiological releases to the air. The DMP provides guidance on data capture, processing and transmittal, and database configuration management. The requirements for the PNNL Site Environmental Monitoring (SEM) Database and associated records are documented in order to assure that vital data are recorded accurately, stored in a manner that retains data integrity, and are suitable for analyst to use. Protocols and procedures must ensure the data will be adequate and robust

    Environmental surveillance master sampling schedule

    Get PDF
    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys

    Solar Powered Radioactive Air Monitoring Stations

    Full text link
    Environmental monitoring of ambient air for radioactive material is required as stipulated in the PNNL Site radioactive air license. Sampling ambient air at identified preferred locations could not be initially accomplished because utilities were not readily available. Therefore, solar powered environmental monitoring systems were considered as a possible option. PNNL purchased two 24-V DC solar powered environmental monitoring systems which consisted of solar panels, battery banks, and sampling units. During an approximate four month performance evaluation period, the solar stations operated satisfactorily at an on-site test location. They were subsequently relocated to their preferred locations in June 2012 where they continue to function adequately under the conditions found in Richland, Washington
    • …
    corecore