126 research outputs found
Vibrational Stability of NLC Linac and Final Focus Components
Vertical vibration of linac components (accelerating structures, girders and
quadrupoles) in the NLC has been studied experimentally and analytically.
Effects such as structural resonances and vibration caused by cooling water
both in accelerating structures and quadrupoles have been considered.
Experimental data has been compared with analytical predictions and simulations
using ANSYS. A design, incorporating the proper decoupling of structure
vibrations from the linac quadrupoles, is being pursued.Comment: 3 pages, 8 figures presented at the LINAC 2002 conference, Gyeongju
Kore
Effect of Cooling Water on Stability of NLC Linac Components
Vertical vibration of linac components (accelerating structures, girders and
quadrupoles) in the NLC has been studied experimentally and analytically.
Effects such as structural resonances and vibration caused by cooling water
both in accelerating structures and quadrupoles have been considered.
Experimental data has been compared with analytical predictions and simulations
using ANSYS. A design, incorporating the proper decoupling of structure
vibrations from the linac quadrupoles, is being pursued.Comment: 6 Pages 13 Figures Presented at The Nanobeam 2002 Workshop (Lausanne
Switzerland
Recommended from our members
Optimization of the BCP processing of elliptical nb srf cavities
At present, the electropolishing (EP) process is considered the key technology unleashing the capability to produce Niobium SRF cavities performing at or above 35 MV/m. Nevertheless buffered chemical polishing (BCP) remains a cheap, simple and effective processing technique for single grain high gradient and polycrystalline lower gradient cavities. BCP will be adopted to chemically process the third harmonic 3.9 GHz cavities being fabricated at Fermilab [1]. The dimensions and the shape of these cavities yield a strong nonuniformity in the material removal between iris and equator of the cells. This paper describes the thermal-fluid finite element model adopted to simulate the process, the experimental flow visualization tests performed to verify the simulation and a novel device fabricated to solve the problem
A superconducting switch for insertion devices with variable period length
Superconducting insertion devices (IDs) are very attractive for synchrotron light sources since they offer the possibility to enhance the tuning range and functionality significantly by period length switching. Period length switching can be realized by reversing the current in a separately powered subset of the superconducting windings. So far, the first demonstration mock-up coil allowing period length tripling was fabricated and tested successfully. Here, we report on the feasibility of superconducting switches built to operate in a liquid helium bath and under conduction cooled conditions
Status of COLDDIAG: A Cold Vacuum Chamber for Diagnostics
One of the still open issues for the development of superconducting insertion
devices is the understanding of the beam heat load. With the aim of measuring
the beam heat load to a cold bore and the hope to gain a deeper understanding
in the beam heat load mechanisms, a cold vacuum chamber for diagnostics is
under construction. The following diagnostics will be implemented: i) retarding
field analyzers to measure the electron energy and flux, ii) temperature
sensors to measure the total heat load, iii) pressure gauges, iv) and mass
spectrometers to measure the gas content. The inner vacuum chamber will be
removable in order to test different geometries and materials. This will allow
the installation of the cryostat in different synchrotron light sources.
COLDDIAG will be built to fit in a short straight section at ANKA. A first
installation at the synchrotron light source Diamond is foreseen in June 2011.
Here we describe the technical design report of this device and the planned
measurements with beam.Comment: Presented at First International Particle Accelerator Conference,
IPAC'10, Kyoto, Japan, from 23 to 28 May 201
Recommended from our members
Eddy current scanning of niobium for SRF cavities at Fermilab
In the framework of SRF cavity development, Fermilab is creating the infrastructure needed for the characterization of the material used in the cavity fabrication. An important step in the characterization of ''as received'' niobium sheets is eddy current scanning. Eddy current scanning is a non-destructive technique first adopted and further developed by DESY with the purpose of checking the cavity material for subsurface defects and inclusions. Fermilab has received and further upgraded a commercial eddy current scanner previously used for the SNS project. This scanner is now used daily to scan the niobium sheets for the Fermilab third harmonic, the ILC, and the Proton Driver cavities. After optical inspection, more than 400 squares and disks have been scanned and when necessary checked at the optical and electron microscopes, anodized, or measured with profilometers looking for surface imperfections that might limit the performance of the cavities. This paper gives a status report on the scanning results obtained so far, including a discussion of the classification of signals being detected
Characterization and long term operation of a novel superconducting undulator with 15 mm period length in a synchrotron light source
A new cryogen-free full scale (1.5 m long) superconducting undulator with a period length of 15 mm (SCU15) has been successfully tested in the ANKA storage ring. This represents a very important milestone in the development of superconducting undulators for third and fourth generation light sources carried on by the collaboration between the Karlsruhe Institute of Technology and the industrial partner Babcock Noell GmbH. SCU15 is the first full length device worldwide that with beam reaches a higher peak field than what expected with the same geometry (vacuum gap and period length) with an ideal cryogenic permanent magnet undulator built with the best material available PrFeB. After a summary on the design and main parameters of the device, we present here the characterization in terms of spectral properties and the long term operation of the SCU15 in the ANKA storage ring
- …