17 research outputs found

    Analisis Dampak Optimasi Simpang Bersinyal Terhadap Emisi Gas Buang

    Full text link
    Siliwangi road is one soars and populous Primary Arterial Road in the Semarang City, so often there is congestion on the roads. Result of frequent congestion on the roads, air pollution which occurs also higher. This study aims to determine how high the air pollution that occur and to provide recommendations for alternative solutions to tackle congestion at the intersection whole observatories, so as to minimize the air pollution that occurs. Traffic survey at the intersection whole observatories done during the morning Peak hour, afternoon Peak hour and evening Peak hours. Survey results are then processed by the Manual Kapasitas Jalan Indonesia (MKJI) 1997 Synchro SimTraffic Program 7.0. Initially, the green time adapted to the needs of the existing condition, then the following adjustments were made in the form of changes in the geometric intersection to accommodate existing traffic conditions. Adjustment of the traffic conditions and the geometric path then known how much pollution that occurred at the intersection. At the intersection of the existing conditions in whole observatories already reached saturation performance , with the calculation of the degree of saturation of the synchro program 7 that almost all of them are above the 1.00 figure. With the adjustment Optimization green time to Simpang whole observatories provide DS to decrease Morning Peak condition that is equal to 5.82%, 5.82% Peak Afternoon, Evening Peak 9.89% and the change in geometric intersection (lane additions of 3.7 m) on condition Morning Peak, Peak Afternoon, Evening Peak resulting decrease in DS respectively 23.80%, 8.95%, and 14.58%. Although not all perform well and there are still some poor performers approach (indicators of poor performance where the value of the degree of saturation exceeds the ideal value of the degree of saturation (DS>0.75). Use of Public Transport assuming 50% removal of the car was replaced with highly efficient use of BRT in reducing the number of DS on condition Morning Peak , Peak Lunch, Afternoon Peak resulting decrease in DS respectively 60.84%, 47.01%, and 61.97%. The scenario design is done well enough for the level of handling performance in the short term. So, it can be concluded that the performance of intersections that were reviewed for the better

    Desain Fly Over Pada Perlintasan Sebidang Jalan Kereta Api Di Jalan Slamet Riyadi Surakarta

    Full text link
    Perencanaan fly over di Daerah Purwosari tepatnya Jalan Slamet Riyadi ini didasarkan oleh perlintasan sebidang dengan jalan kereta api yang menyebabkan lalu lintas di persilangan tersebut berhenti total ketika ada kereta api melintas. Dengan adanya pembangunan fly over pada perlintasan tersebut, diperhitungkan bahwa arus lalu lintas di Jalan Slamet Riyadi akan menjadi semakin lancar, hal ini dapat dilihat dari nilai derajat kejenuhan ruas jalan tersebut yang dihitung berdasarkan Manual Kapasitas Jalan Indonesia (MKJI) 1997, yang berkurang dari 1,26 menjadi 0,62 setelah direncanakannya fly over. Fly over ini direncanakan dengan tipe 2 lajur 2 arah tak terbagi dengan lebar 11 m dan panjang 410,8 m. Struktur atas fly over menggunakan balok prategang dengan profil I. Struktur bawah fly over menggunakan dua buah abutment, sembilan buah pilar dan pondasi jenis bore pile dengan diameter 0,6 m dan kedalaman 18 m

    Analisa Dampak Lalu Lintas Akibat Keterbatasan Lahan pada Ruang Parkir Pasar Tradisional di Kota Semarang

    Full text link
    Pasar tradisional umumnya disediakan macam bahan pokok keperluan rumah tangga dan biasanya berlokasi di tempat terbuka. Pasar Karangayu dan Pasar Sampangan adalah salah satu pasar tradisional di Kota Semarang. Lahan parkir yang tersedia di wilayah kedua pasar tersebut sangat terbatas, sehingga tidak mampu untuk menampung jumah kendaraan yang masuk ke area parkir. hal ini menyebabkan banyak kendaraan memilih parkir di badan jalan dan mengganggu arus lalu lintas. Penelitian ini bertujuan mengidentifikasi kegiatan parkir di halaman pasar, menganalisa kebutuhan ruang parkir dan pengaruh kinerja jalan akibat parkir di badan jalan kaitannya dengan dampak lalu lintas, memberi rekomendasi penyelenggaraan parkir dan mengetahui nilai pelayanan yang dibutuhkan untuk menentukan biaya optimum.Pada penelitian ini yang digunakan adalah data primer berupa survei lapangan dan data sekunder sebagai acuan dalam menganalisis kebutuhan ruang parkir dan pengaruh kinerja jalan akibat dampak lalu lintas di Pasar Karangayu dan Pasar Sampangan.Adapun hasil penelitian dengan metode distribusi kedatangan didapatkan rata-rata di Pasar Karangayu dan Pasar Sampangan yaitu 36 dan 32 kend/jam, untuk distribusi waktu pelayanan didapatkan rata-rata di parkir Pasar Karangayu dan Pasar Sampangan yaitu 57 dan 46 menit, dipadukan dengan disediakan ruang parkir konsep kedua pasar tradisional adalah tipe A, ruang parkir Pasar Karangayu untuk mobil yaitu 550 m2 dan motor 229,5 m2. Pasar Sampangan untuk mobil yaitu 300 m2 dan motor 463,5 m2. Nilai derajat kejenuhan sesuai MKJI jalan di depan Pasar Sampangan tahun 2016 adalah 0,93>0,75 digambarkan bahwa kinerja jalan dalam kondisi macet karena adanya aktifitas pasar yang digunakan parkir di badan jalan dan Pasar Karangayu dari arah timur sebesar 0,58<0,75 kinerja jalan dalam kondisi lancar walau ada aktifitas pasar.Dapat disimpulkan dengan ditentukan nilai rasio luas lahan parkir harus disediakan terhadap luas bangunan pasar maka area parkir dapat mencukupi kendaraan parkir hingga 5 tahun ke depan dibuat dapat semakin lancar kendaraan yang akan mencari ruang parkir ataupun yang keluar dari area parkir pasar tersebut. Sehingga Pemerintah Daerah bisa menjadikan patokan setiap adanya pembangunan pasar baru ataupun renovasi pasar lama agar dapat menggunakan rasio luas area parkir sebesar 0,24 untuk area parkir motor dan 0,20 untuk area parkir mobil terhadap luas bangunan pasar sebagai syarat perizina

    Analisis Tingkat Pelayanan Dan Penyesuaian Tarif Bus Antar Kota Dalam Provinsi (Akdp) Di Provinsi Jawa Tengah

    Full text link
    Pelayanan bus AKDP Jawa Tengah terindikasi memiliki permasalahan antara lain tidak meratanya jaringan pelayanan angkutan umum, tidak sesuainya rute trayek yang terdaftar dengan kondisi di lapangan, kondisi bus yang sudah tidak layak dan kesenjangan load factor. Tujuan dari penelitian ini adalah untuk mengetahui tingkat pelayanan bus AKDP, tingkat isian pada tiap trayek, biaya operasi kendaraan dan kesesuaian tarif yang berlaku pada kondisi saat ini. Metodologi yang dilakukan untuk analisis tingkat pelayanan dengan menggunakan indikator efektivitas dan efisiensi. Sementara itu untuk analisis tingkat isian menggunakan data-data dari survei dinamis. Perhitungan BOK menggunakan panduan dari Dishubkominfo Jawa Tengah. Dari metode analisis tingkat pelayanan akan menentukan apakah trayek telah efektif dan efisien atau belum. Sedangkan dari metode analisis tingkat isian menghasilkan pola perjalanan yang menentukan trayek tersebut perlu dilakukan penggantian jenis armada atau tidak. Perhitungan BOK menghasilkan nilai yang digunakan untuk menghitung tarif yang sesuai. Hasil dari analisis tingkat pelayanan yaitu kelima trayek tersebut berada di bawah standar yang berlaku pada indikator kecepatan, headway, waktu tunggu penumpang, load factor, utilisasi, availability dan umur kendaraan. Sementara itu untuk analisis tingkat isian penumpang menghasilkan pola perjalanan yang mengharuskan adanya Perubahan jenis armada pada beberapa trayek yang nilai load factornya berada di bawah 0,70. Kemudian dari perhitungan BOK menghasilkan tarif baru Rp257,55/km. Kelima trayek dinyatakan tidak efektif dan tidak efisien karena tidak memenuhi nilai standar pada sebagian besar indikator. Load factor yang memenuhi standar yaitu Semarang – Gubug - Purwodadi.PP dengan nilai load factor 0,90. Total BOK bus besar yaitu Rp7.366,16/bus/km. Perlu dilakukan perbaikan dan peningkatan pada semua indikator agar load factor dapat meningkat. Untuk mendapatkan data yang lebih valid, maka perlu dilakukan penelitian pada waktu peak dan off peak. Kemudian melakukan survei statis agar nilai headway pada kondisi lapangan dapat lebih akurat

    Analisis Dan Optimasi Simpang Bersinyal Semi Koordinasi Dengan Menggunakan Synchro 7.0

    Full text link
    The change of used areas in Siliwangi road, from settlement to be the centre of business – service, industrials and office, will appear traffic movement in Krapyak and Tol Krapyak – Jatingaleh intersection. Moreover there will be some problem on traffic phenomena as traffic jam, time of delay, air pollution that increase, accident and other traffic problem that will cause lose time, fuel use, and cost. This study aims to analyzed the performance of Krapyak intersection and Tol Krapyak – Jatingaleh intersection, it should be changed the traffic management and geometric research to minimized the traffic jam and air pollution on both intersection. The pattern of the movement of the road beside both intersection can be obtained by using origin – destination matrix (ODM). The advantage of this method in which the vehicle volume and the value of obstacle in each intersection, the pattern traffic movement can be gained. Of course it will minimized the cost, time, human resources. The performance of the intersection will be measure and analyzed using Synchro 7.0 from America. The advantage of this program is able to stimulate planning yield and easy to operate as well. The alternated solution from this study is to broaden road lines of 3,5 meter on each intersection and the alternated road for vehicle to public transportation in the value of 40%. The result of this analyzed in existing condition is measured by DS value on Krapyak intersection 1,29; emission of CO 2089 gram and in Tol Krapyak – Jatingaleh is of 1,41; emission CO 1903 gram. The broaden of road line (3,5 meter) the value DS Krapyak intersection 0,73 (decrease 43,3%); emission CO 2293 gram (increase 8,89%) in Tol Krapyak – Jatingaleh intersection the value DS 0,74 (decrease 47,5%); emission CO 1899 gram (decrease 0,21%). The assumption of the change of private to public transportation of 40% the value DS in Krapyak intersection 0,71% (decrease 44,9%); emission CO 1353 gram (decrease 35,2%) in Tol Krapyak – Jatingaleh intersection the value DS 0,62% (decrease 56%); emission CO 1120 gram (decrease 41,1%). The result of analysis can be concluded, assumption transfer of private car to public transportation equal to 40% is solution able to be optimal of performance service of intersection. Where result of DS equal to 0,71 and 0,62 which have fulfilled conditions of intersection performance ≀ 0,75, and also emission of CO 1,353 ppm and 1,120 ppm have fulfilled conditions of value float pollution boundary that is, ranging from 0 - 50 ppm where, entering in good category (there no effect to environment and health). Hence can be recommended, for related government utilize to repair the pre requirement and suitable requirement public transportations, and improve security, service of consumer of public transportation. In research hereinafter, enabled to use ODM method and program of Synchro 7.0

    Pemodelan Pemilihan Moda Dengan Metode Stated Preference, Studi Kasus Perpindahan Dari Sepeda Motor Ke Brt Rute Semarang – Kendal

    Full text link
    Kendal regency as satellite city of Semarang has established a mutual relationship and completing each other. The economic development and population insde the rural area of Semarang and Kendal regency has raised up since the street of Jerakah - Mijen has been widened in 2004 - 2012. This can be seen during working hour in which Semarang - Kendal road was fully filled by vehicles especially motorcycle. Based on this, the research must be done to reduce the congestion that occurs around the Semarang - Kendal. This study aims to perform modal choice modeling with stated preference methods, so that the government can take better policies to support the operation of the BRT Semarang - Kendal route. The survey was conducted by spreading the questionnaire and interview that consist of socio-economic characteristic of the respondent, route characteristic, and questionnaire that is organized through stated preference technique with additional attribute namely, the margin of route cost and margin of time used of departure between motorcycle and BRT Semarang-Kendal route. Study sites were around the Semarang - Kendal and on the bus route Semarang - Kendal. From the research result, it is shown that the choice of vehicle is based on the margin of route cost, namely UBRT – USM = 1,2353 - 0,0007 (Ξ”X1). Meanwhile, the choice of vehicle based on the margin of time used is UBRT – USM = 2,61336 - 0,17441 (Ξ”X2). In addition, the choice of transportation mode based on margin of cost and time is UBRT – USM = 2,6683 - 0,7365Ξ”X1 + 0,00219Ξ”X2. The potential of the shifting of passenger from motorcycle to BRT based on the route cost is 74%. Whereas, based of time used is 50%, and 32% is based on both choices. In addition to modeling mode choice, we need to Traffic Demand Management (TDM) are both on regular lines Semarang - Kendal, because the fundamental purpose of building a BRT route Semarang - Kendal limited only to reduce congestion caused by the use of motorcycles in bulk

    Analisis Kecelakaan Lalu Lintas Pada Ruas Jalan Arteri Primer (Studi Kasus Jalan Maospati – Solo, Segmen 28.029, Sta 11 +020 – 18+020)

    Full text link
    Maospati Highway in Solo is one of the main roads in the East Java Province, considered as accident-prone. As a national road and primary artery, this road has an important role in the distribution of goods and services both intra and interprovincial. The type of highway is 4/2 UD with 11 meters width. The aim of this study is to determine which areas are considered as the accident-prone areas or blacksite, the factors cause the accidents, and suggest some prevention recommendations. The necessary data is the LHR data obtained from the Department of Public Works Binamarga East Java province and traffic accidents data of Police Magetan, East Java. Blacksite analysed by method based on accident rates path length LQ and intersection LQ, and the Accident Rate. Based on the analysis, it is conluded that blacksite occurred in the village of Malang, with a value of LQ> 1, and Accident Rate exceeded the upper limit value. The dominant factor causes the accidents is human factor, such as lack of anticipation when driving. The recommendations suggested for the location are the provision of signs, rumble strips and other safety facilities

    Analisis Antrian Angkutan Barang Pada Jembatan Timbang Dengan Metode Simulasi Multiple Channel ( Studi Kasus Pada Jembatan Timbang Sarang )

    Full text link
    Sarang Weighbridge is one of the busy weighbridge that serve freight vehicles in the province of Central Java. With the large number of vehicles to be serviced will cause potential queues at the weighbridge . This study aims to determine the pattern of queues that occur at weigh stations and provide a recommendation to the appropriate queue system to be applicable to the Sarang Weighbridge , so it can increased the performance of the weighbridge.The method used to analyze queues in this study is the simulation method . This method is used because there are many variables at Weighbridge queuing system so it will be very difficult when using the methods of mathematical analysis . Simulation begins with field survey data. The data is used to perform the simulation and the results are then tested for compliance with the Poisson distribution. From the simulation results will then be made a better queuing models.Based on the analysis that we did, needed a better queuing system and the need to improve the infrastructure and human resources in order to better service on Sarang Weighbridge
    corecore