3,747 research outputs found

    Policy and Practice Brief: The Transition from Disability Benefits to Retirement Benefits

    Get PDF
    The transition from being considered a “person with a disability” to a “retired individual” is becoming an increasingly important issue worth more study. This brief focuses on this pivotal transition in a person’s life and discusses issues for BPA&O and PABSS practitioners

    Highlights from the VERITAS AGN Observation Program

    Full text link
    The VERITAS array of four 12-m imaging atmospheric-Cherenkov telescopes began full-scale operations in 2007, and is one of the world's most sensitive detectors of astrophysical VHE (E>100 GeV) γ\gamma-rays. Observations of active galactic nuclei (AGN) are a major focus of the VERITAS Collaboration, and more than 60 AGN, primarily blazars, are known to emit VHE photons. Approximately 3400 hours have been devoted to the VERITAS AGN observation program and roughly 160 AGN are already observed with the array, in most cases with the deepest VHE exposure to date. These observations have resulted in 34 detections, most of which are accompanied by contemporaneous, multi-wavelength observations, enabling a more detailed study of the underlying jet-powered processes. Recent highlights of the VERITAS AGN observation program, and the collaboration's long-term AGN observation strategy, are presented.Comment: 8 pages, 4 figures; in Proceedings of the 34th International Cosmic Ray Conference (ICRC 2015), The Hague (The Netherlands

    PPP effectiveness study

    Get PDF
    This design note presents a study of the Procedures and Performance Program (PPP) effectiveness. The intent of the study is to determine manpower time savings and the improvements in job performance gained through PPP automated techniques. The discussion presents a synopsis of PPP capabilities and identifies potential users and associated applications, PPP effectiveness, and PPP applications to other simulation/training facilities. Appendix A provides a detailed description of each PPP capability

    Advanced crew procedures development techniques: Procedures and performance program training plan

    Get PDF
    A plan developed to support the training of PPP users in the operations associated with PPP usage is described. This document contains an overview of the contents of each training session and a detailed outline to be used as the guideline for each session
    corecore