124 research outputs found

    Strategic green infrastructure planning in Germany and the UK: a transnational evaluation of the evolution of urban greening policy and practice

    Get PDF
    The evolution of Green Infrastructure (GI) planning has varied dramatically between nations. Although a grounded set of principles are recognized globally, there is increasing variance in how these are implemented at a national and sub-national level. To investigate this the following paper presents an evaluation of how green infrastructure has been planned for in England and Germany illustrating how national policy structures facilitate variance in application. Adopting an evaluative framework linked to the identification of GI, its development and monitoring/ feedback the paper questions the impacts on delivery of intersecting factors including terminology, spatial distribution and functionality on effective GI investment. This process reviews how changing policy structures have influenced the framing of green infrastructure policy, and subsequent impact this has on the delivery of green infrastructure projects

    Sicherheitsanalysen und weiterfuehrende Untersuchungen zum Endlager Morsleben

    No full text
    Work during phase II of the project was aimed at following up and assessing retrofitting measures taken on the basis of recommendations derived from the safety analysis carried out by the GRS/BGR. The long-term safety considerations of the safety analysis were updated and deepened by follow-up activities. For this purpose, the transport events of radionuclides at the Morsleben repository during the post-operational phase were calculated by means of a close-to-reality mine model, the code MARNIE developed by the GRS to handle a complex mine model of the Bartensleben mine. Work and the model assumptions of the mine workings topology and of the hydrogeology of the site were based on the knowledge available to the GRS when carrying out the safety analysis. As a result of the analyses, the release rates of radionuclides into the biosphere were discussed and compared with the assessments of the GRS safety analysis. The consequences, i.e. potential radiological loads, are discussed. (orig./HP)Ziel der Arbeiten in der Phase II des Vorhabens war die Verfolgung und Bewertung von Nachruestmassnahmen aufgrund der Empfehlungen aus der Sicherheitsanalyse der GRS/BGR. Es wurde eine Aktualisierung und Vertiefung der in der Sicherheitsanalyse durchgefuehrten Langzeitsicherheitsbetrachtungen durch weiterfuehrende Arbeiten vorgenommen. Dazu wurden die Transportvorgaenge von Radionukliden im ERAM in der Nachbetriebsphase mit Hilfe eines realitaetsnahen Bergwerksmodell berechnet mit dem in der GRS entwickelten Codes MARNIE zur Behandlung eines komplexen Bergwerkmodells der Grube Bartensleben. Basis der Arbeiten und der Modellannahmen zur Topologie des Grubengebaeudes und der Hydrogeologie des Standortes war der Kenntnisstand, wie er der GRS bei der Erarbeitung der Sicherheitsanalyse vorlag. Als Ergebnis der Analysen wurden die Freisetzungsraten von Radionukliden in die Biosphaere diskutiert und ein Vergleich mit den Abschaetzungen der Sicherheitsanalyse der GRS vorgenommen. Die Konsequenzen, d.h. die potentiellen radiologischen Belastungen wurden diskutiert. (orig./HP)Available from TIB Hannover: RO 3190(427) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekSIGLEDEGerman

    Sicherheitsuntersuchungen zur Nachbetriebsphase von Endlagern fuer radioaktive Abfaelle

    No full text
    Aufgabe und Ziel des GRS-Vorhabens waren die Bewertung der vorhandenen bzw. in der Entwicklung befindlichen Rechenmethoden zur Langzeitsicherheit eines Endlagers. Stand der Qualifizierung dieser Methoden und Modelle wurde bewertet, die Qualifizierung der Modelle weitergetrieben und die Umsetzung des anerkannten Standes von Wissenschaft und Technik in den Sicherheitsanalysen beurteilt. Der Bericht enthaelt die Kurzfassungen der Arbeitsgebiete Geomechanik/Thermomechanik, Nahfeld-Analysen, Fernfeld-Geosphaere, Biosphaere und chemische Effekte. Anhaenge enthalten oeffentlich zugaengliche Berichte und Vortraege zum BMU-Vertrag SR 460, sowie Kurzfassungen und Schlussfolgerungen veroeffentlichter Berichte. (HP)Task and objective of the GRS project was the assessment of available computation methods, and of those under development, for long-term safety of repositories. The state of qualification of these methods and models was evaluated; models were further qualified, and the translation of the recognized state-of-the-art into safety analyses was assessed. The report contains abstracts of the following fields of work: geomechanics/thermomechanics; near field analyses; far field - geosphere; biosphere and chemical effects. Appendices contain reports accessible to the public and lectures on the BMU contract SR 460 as well as abstracts and conclusions of published reports. (HP)SIGLEAvailable from TIB Hannover: RO 3190(1994-395) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekDEGerman

    Internationale Entwicklung zur Beurteilung der langzeitigen Sicherheit von Endlagern fuer HAW und abgebrannte Brennelemente

    No full text
    This report describes the status of the common understanding of the international community regarding safety assessment for waste disposal in deep geological formations. Developments in the international community over the last decade concerning knowledge, assessment and also issues in the field of long term safety of waste disposal are reported. The repository project Gorleben has been evaluated with respect to this background. Recommendations for future procedures are formulated. (orig.)Der Bericht stellt den Status der international anerkannten Basis zur Sicherheitsbewertung von Endlagern in tiefen geologischen Formationen zusammen. Er beschreibt die Entwicklung langzeitsicherheitsrelevanter Erkenntnisse, Fragestellungen und Bewertungen der letzten Jahre und gibt das gemeinsame Verstaendnis der mit der Endlagerung befassten internationalen Gemeinschaft wieder. Vor diesem Hintergrund wird das Endlagerprojekt Gorleben bewertet. Es werden Empfehlungen fuer das weitere Vorgehen formuliert. (orig.)Available from TIB Hannover: RO 3190(2001-562) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekSIGLEDEGerman

    Koerperschallueberwachung in Leichtwasserreaktoren Internationaler Status

    No full text
    Available from GRM Werbeberatung - Werbemittlung - PR, Eggenstein-Leopoldshafen (DE) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekSIGLEDEGerman

    Thermomechanische Berechnungen im Nahbereich von HAW-Gebinden

    No full text
    Available from GRM Werbeberatung - Werbemittlung - PR, Eggenstein-Leopoldshafen (Germany, F.R.) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekSIGLEDEGerman

    Unsicherheits- und Sensitivitaetsanalysen fuer Grundwasser- und Schadstofftransportmodelle mit raeumlich variierenden Parametern

    No full text
    In der GRS Koeln wird gegenwaertig eine auf geostatistischen Algorithmen basierende schrittweise Methodik zur hydrogeologischen Charakterisierung von Endlagerstandorten entwickelt und mit Daten vom Standort Gorleben getestet und demonstriert. Diese Methodik soll die Beruecksichtigung der raeumlichen Variabilitaet hydrogeologischer Eigenschaften und von Unsicherheiten in der Standortcharakterisierung im Rahmen probabilistischer Unsicherheitsanalysen fuer die Bewertung der Langzeitsicherheit von Endlagern radioaktiver Abfaelle ermoeglichen. Im vorliegenden Bericht wird die Ueberlagerung der zunaechst generierten raeumlichen Verteilung hydrogeologischer Einheiten mit raeumlich variierenden hydrogeologischen Parametern dargestellt. Mit den entstandenen Modellen wurden probabilistische Unsicherheitsanalysen fuer Grundwasser- und Schadstoffmigrationsmodelle durchgefuehrt. Ausserdem wurde eine Methode zur Durchfuehrung probabilistischer Sensitivitaetsanalysen fuer raeumlich variable Parameter vorgestellt und demonstriert. Es konnte gezeigt werden, dass der dargestellte Zugang adaequat und bei einer Datenlage wie in Gorleben anwendbar ist. Allerdings war eine deutliche Abhaengigkeit der erzielten Ergebnisse von Modellannahmen zur raeumlichen Verteilung der hydrogeologischen Einheiten wie auch der Parameter zu erkennen. (orig.)Presently GRS Koeln develops a method based on geostatistical algorithms for the hydrogeological characterisation of repository sites. The method is demonstrated and tested using data from the Gorleben site. It is intended to take into account the spatial variability of hydrogeological features and the uncertainties in site characterisation in probabilistic uncertainty analyses for the evaluation of the long-term safety of final repositories for radioactive waste. The report presented here describes how the previously generated spatial distribution of hydrogeological units is superimposed by hydrogeological parameters varying with position. The models obtained have been utilised for probabilistic uncertainty analyses for groundwater and contaminant migration models. In addition, a method for probabilistic sensitivity analyses for parameters varying with position is presented and demonstrated. It has been shown that the approach presented is adequate and applicable to a dataset like the one from Gorleben. However, a significant dependence of the results obtained on the model assumptions concerning the spatial distribution of parameters was visible. (orig.)SIGLEAvailable from TIB Hannover: RO 3190(2001-589) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekDEGerman

    Anwendung des Rechencodes STEALTH auf ein COSA II Benchmark-Problem

    No full text
    SIGLEAvailable from TIB Hannover: RO 3190(283) / FIZ - Fachinformationszzentrum Karlsruhe / TIB - Technische InformationsbibliothekDEGerman
    • …
    corecore