54,122 research outputs found
Simulation study of gust alleviation in a tilt rotor aircraft, volume 1
The response to vertical turbulence in cruise of the HTR XV-15 design is studied using simulation techniques. This design is a modified version of the XV-15 with a hingeless fiberglass soft-in-plane rotor system. The parameters of a gust alleviation system are determined and the performance of the system is evaluated over a range of cruise velocities and altitudes
Measurements of antenna impedance in the ionosphere. II. Observing frequency greater than the electron gyro frequency
Short dipole antenna impedance measurements in ionosphere at observing frequency above electron gyrofrequenc
Low Intensity Decameter Emissions from Jupiter
Low intensity decameter emissions from Jupite
Central Atlantic regional ecological test site: A prototype regional environmental information system
There are no author-identified significant results in this report
The Unusual Substrate Specificity of a Virulence Associated Serine Hydrolase from the Highly Toxic Bacterium, \u3cem\u3eFrancisella tularensis\u3c/em\u3e
Francisella tularensis is the causative agent of the highly, infectious disease, tularemia. Amongst the genes identified as essential to the virulence of F. tularensis was the proposed serine hydrolase FTT0941c. Herein, we purified FTT0941c to homogeneity and then characterized the folded stability, enzymatic activity, and substrate specificity of FTT0941c. Based on phylogenetic analysis, FTT0941c was classified within a divergent Francisella subbranch of the bacterial hormone sensitive lipase (HSL) superfamily, but with the conserved sequence motifs of a bacterial serine hydrolase. FTT0941c showed broad hydrolase activity against diverse libraries of ester substrates, including significant hydrolytic activity across alkyl ester substrates from 2 to 8 carbons in length. Among a diverse library of fluorogenic substrates, FTT0941c preferred α-cyclohexyl ester substrates, matching with the substrate specificity of structural homologues and the broad open architecture of its modeled binding pocket. By substitutional analysis, FTT0941c was confirmed to have a classic catalytic triad of Ser115, His278, and Asp248 and to remain thermally stable even after substitution. Its overall substrate specificity profile, divergent phylogenetic homology, and preliminary pathway analysis suggested potential biological functions for FTT0941c in diverse metabolic degradation pathways in F. tularensis
CARETS: A prototype regional environmental information system. Volume 12: User evaluation of experimental land use maps and related products from the central Atlantic test site
The author has identified the following significant results. Recommendations resulting from the CARETS evaluation reflect the need to establish a flexible and reliable system for providing more detailed raw and processed land resource information as well as the need to improve the methods of making information available to users
Recommended from our members
Proposed Keystone XL Pipeline: Legal Issues
[Excerpt] In 2008, TransCanada Corp. applied for a presidential permit from the State Department to construct and operate an oil pipeline across the U.S.-Canada border in a project known as Keystone XL. The Keystone XL pipeline would transport oil produced from oil sands in Alberta,Canada, to Gulf Coast refineries. The permit application was subjected to review by the State Department pursuant to executive branch authority over cross-border pipeline facilities as articulated in Executive Order 13337.
After several phases of review, on November 10, 2011, the State Department announced that it would seek additional information about alternative pipeline routes before it could move forward with a national interest determination. In response, several pieces of legislation were introduced, including Title V of the Temporary Payroll Tax Cut Continuation Act of 2011. Title V dictated that President must grant the Keystone XL pipeline permit within 60 days of the law’s enactment, unless the President determined that the pipeline is not in the national interest. If the President did not make a national interest determination and took no action to grant the permit, then the law provided that the permit “shall be in effect by operation of law.” The Temporary Payroll Tax Cut Continuation Act of 2011 (P.L. 112-78), including Title V addressing the Keystone XL permit, was enacted on December 23, 2011.
Pursuant to the requirements of Title V, on January 18, 2012, the State Department recommended that “the presidential permit for the proposed Keystone XL pipeline be denied and, that at this time, the TransCanada Keystone XL Pipeline be determined not to serve the national interest. ”The same day, the President stated his determination that the Keystone XL pipeline project“ would not serve the national interest.
”New legislative activity with respect to the permitting of border-crossing facilities, a subject previously handled exclusively by the executive branch, has triggered inquiries as to whether this raises constitutional issues related to the jurisdiction of the two branches over such facilities. Additionally, as states have begun to contemplate taking action with respect to the pipeline siting, some have questioned whether state siting of a pipeline is preempted by federal law. Others argue that states dictating the route of the pipeline violates the dormant Commerce Clause of the Constitution which, among other things, prohibits one state from acting to protect its own interests to the detriment of other states.
This report reviews those legal issues. First, it suggests that legislation related to cross-border facility permitting is unlikely to raise significant constitutional questions, despite the fact that such permits have traditionally been handled by the executive branch alone pursuant to its constitutional “foreign affairs” authority. Next, it observes generally that state oversight of pipeline siting decisions does not appear to violate existing federal law or the Constitution. Finally, the report suggests that State Department’s implementation of the existing authority to issue presidential permits appears to allow for judicial review of its National Environmental Policy Act determinations
- …