3 research outputs found

    Gaussian processes for history-matching : application to an unconventional gas reservoir

    No full text
    The process of reservoir history-matching is a costly task. Many available history-matching algorithms either fail to perform such a task or they require a large number of simulation runs. To overcome such struggles, we apply the Gaussian Process (GP) modeling technique to approximate the costly objective functions and to expedite finding the global optima. A GP model is a proxy, which is employed to model the input-output relationships by assuming a multi-Gaussian distribution on the output values. An infill criterion is used in conjunction with a GP model to help sequentially add the samples with potentially lower outputs. The IC fault model is used to compare the efficiency of GP-based optimization method with other typical optimization methods for minimizing the objective function. In this paper, we present the applicability of using a GP modeling approach for reservoir history-matching problems, which is exemplified by numerical analysis of production data from a horizontal multi-stage fractured tight gas condensate well. The results for the case that is studied here show a quick convergence to the lowest objective values in less than 100 simulations for this 20-dimensional problem. This amounts to an almost 10 times faster performance compared to the Differential Evolution (DE) algorithm that is also known to be a powerful optimization technique. The sensitivities are conducted to explain the performance of the GP-based optimization technique with various correlation functions
    corecore