2 research outputs found

    Focusing strength measurements of the main quadrupoles for the LHC

    Get PDF
    More than 1100 quadrupole magnets of different types are needed for the Large Hadron Collider (LHC) which is in the construction stage at CERN. The most challenging parameter to measure on these quadrupoles is the integrated gradient (Gdl). An absolute accuracy of 0.1% is needed to control the beta beating. In this paper we briefly describe the whole set of equipment used for Gdl measurements: Automated Scanner system, Single Stretched Wire system and Twin Coils system, concentrating mostly on their absolute accuracies. Most of the possible inherent effects that can introduce systematic errors are discussed along with their preventive methods. In the frame of this qualification some of the magnets were tested with two systems. The results of the intersystem cross-calibrations are presented. In addition, the qualification of the measurement system used at the magnet manufacturer's is based on results of more than 40 quadrupole assemblies tested in cold conditions at CERN and in warm conditions at the vendor site.peer-reviewe

    Electrical and magnetic performance of the LHC short straight sections

    Get PDF
    The Short Straight Section (SSS) for the Large Hadron Collider arcs, containing in a common cryostat the lattice quadrupoles and correction magnets, have now entered series production. The foremost features of the lattice quadrupole magnets are a two-in-one structure containing two 56 mm aperture, two-layers coils wound from 15.1 mm wide NbTi cables, enclosed by the stainless steel collars and ferromagnetic yoke, and inserted into the inertia tube. Systematic cryogenic tests are performed at CERN in order to qualify these magnets with respect to their cryogenic and electrical integrity, the quench performance and the field quality in all operating conditions. This paper reports the main results obtained during tests and measurements in superfluid helium. The electrical characteristics, the insulation measurements and the quench performance are compared to the specifications and expected performances for these magnets. The field in the main quadrupole is measured using three independent systems: 10-m long twin rotating coils, an automatic scanner, and single stretched wire. A particular emphasis is given to the integrated transfer function which has a spread of around 12 units rms in the production and is a critical issue. The do-decapole harmonic component, which required trimming through a change in coil shims, is also discussed. Finally, the magnetic axis measurements at room temperature and at 1.9 K, providing the nominal vertical shift for installation are reported.peer-reviewe
    corecore