1,637 research outputs found

    Decision Support System for Evaluating Rural Water Supply Infrastructure Scenarios

    Get PDF
    This paper seeks to develop a methodology that will be useful for rural water districts in assessing the future of their water systems infrastructure. In particular, the use of free water simulation software and publicly available data on population, roads, and terrain present rural water systems with the opportunity to analyze their existing distribution system and forecast where problems are likely to occur. This methodology will allow various alternatives (such as consolidation with a neighboring system, or pipe upgrades) to be evaluated and the costs of implementing these alternatives to be explored. Finally, different avenues for funding the associated costs can be summarized and presented to the community, including the steps needed to apply for popular grant and loan programsRural Water, Infrastructure, Simulation, EPANET, Community/Rural/Urban Development, R53, R58,

    Kajian Kelayakan Pemanfaatan Suplai Air Baku pada Sistem Transmisi Jalur Bregas I Pdab Tirta Utama Jateng Unit Bregas sebagai Potensi Energi Listrik

    Full text link
    PDAB Tirta Utama Jateng adalah penyedia air bersih bagi kabupaten Brebes, Kota Tegal, dan Kabupaten Tegal. Salah satu jaringan transmisi yang dimiliki adalah Sistem Transmisi Jalur Bregas I yang didalam nya teritegrasi Sistem Transmisi Jalur Bregas II. Jalur Bregas I memiliki sisa tekan yang cukup besar pada setiap bangunan sistem transmisi. Apabila kondisi ini dimanfaatkan berpotensi menghasilkan energi listrik.. Debit pada kondisi eksisting sekarang maksimal sebesar 250,5 l/s . Dari survey lapangan terdapat debit yang belum termanfaatkan menjadi air baku sebesar 335 l/s pada mata air banyumudal (jalur bregas I) dan 385,8 l/s pada mata air suci (bregas II). Namun, tidak semua debit yang tidak termanfaatkan ini terpakai. Dilakukan pemodelan kondisi hidrolik menggunakan watercad v8i dengan variasi debit penambahan 100 l/s, 248 l/s, dan 348 l/s. hasil pemodelan ketiga nya masih memiliki kecepatan air diantara 0,3 – 3 m/s sehingga dipilih penambahan debit 348 l/s. Potensi energi listrik yang dihasilkan dengan debit optimal menjadi 599 l/s serta 3 (tiga) sisa tekan paling besar yaitu 101.08 m, 71.14.m dan 70.47 adalah 504.86 kW, 355.34 kW, dan 351.97 kW

    Studi Perencanaan Jaringan Suplai Air untuk Meningkatkan Kebutuhan Air Bersih di Kabupaten Kotabaru - Kalimantan Selatan

    Full text link
    Dalam rangka pendayagunaan dan pengembangan sumber air di kabupaten Kotabaru, kegiatan penyediaan air sarana air baku bagi penduduk setempat merupakan salah satu bagian yang harus diperhatikan oleh pemerintah. Sarana air baku merupakan kebutuhan pokok manusia, terdapat berbagai macam sumber air yang dapat dipergunakan sebagai sumber air seperti air hujan, air permukaan, danau, sungai, mata air dan air tanah bawah permukaan. Perhitungan proyeksi penduduk dapat dilakukan dengan metode eksponensial, dan pemilihan metode proyeksi pertumbuhan penduduk di atas berdasarkan cara pengujian statistik yakni berdasarkan pada nilai koefesien korelasi yang terbesar 0,99165. Untuk perhitungan peningkatkan suplai debit air di Gunung Perak dan Gunung Relly dilakukan dengan bantuan Software WaterCAD, Software ini merupakan program komputer jaringan air bersih yang dapat disimulasikan sesuai dengan kriteria perencanaan. Pada tahun 2012, debit yang tersedia 55 m3,dan debit air bersih yang dibutuhkan sampai tahun 2022 adalah 0,870497 m3 dengan tingkat kebocoran 15%. Prediksi jumlah penduduk yang harus dilayani 10 tahun mendatang ( Tahun 2022 ) adalah sebanyak 379133 jiwa. Hasil perhitungan dengan menggunakan software WaterCAD diketahui tekanan rendah dimulai pada saat kebutuhan akan air meningkat yaitu pada pukul 06.00-08.00. Tekanan meningkat saat kebutuhan air mulai menurun yaitu pada pukul 08.00-16.00, kemudian tekanan kembali menurun pada pukul 16.00-18.00 seperti ditunjukkan pada Koefisien Faktor Pengali (Load Factor) terhadap kebutuhan air bersih

    Propuesta de mejoramiento para la óptima operación del sistema de acueducto del municipio La Palma (Cundinamarca)

    Get PDF
    Trabajo de InvestigaciónEl proyecto de investigación muestra una propuesta de mejoramiento para la óptima operación del sistema de acueducto del municipio de La Palma Cundinamarca, se utilizó el programa Bentley WaterCAD, es un software comercial de análisis, modelación y gestión de redes a presión (sistemas de distribución o de riego), para poder así saber el comportamiento y operación, y los problemas que se presentan en la Red del sistema de acueducto.INTRODUCCIÓN 1. GENERALIDADES 2. MODELACIÓN HIDRÁULICA DEL SISTEMA, RED PRINCIPAL 3. PROPUESTA DE MEJORAMIENTO 4. CONCLUSIONES 5. RECOMENDACIONES BIBLIOGRAFÍA ANEXOSPregradoIngeniero Civi

    DESIGN OF A WATER STORAGE AND TRANSMISSION SYSTEM FOR WASTEWATER REUSE IN COVENANT UNIVERSITY

    Get PDF
    This research is focused at designing of water storage facilities of size 875,000 litres (750,000 litres for underground water storage, and 125,000 Litres for elevated steel tank) of treated wastewater and its transmission system for the storage and re-use of treated wastewater. The project is aimed to structurally design water storage facilities and its transmission system from the reservoir to the overhead tank for the re-use of treated wastewater in Covenant University. The design works was divided into two major parts namely: Transmission system design, and water storage facility Design. Transmission design was divided into two, which are the field activities, and the software activities. Magellan eXplorist 350H North America GPS (Global Positioning System) was used for the field activities, it was used to determine coordinates (Longitudinal and Latitudinal) of various location of points in the university campus, its key usage was to determine the lowest and the highest elevation points on campus, the highest elevated coordinate point was located in between the male postgraduate hall of residence and the postgraduate cafeteria, and the lowest elevated point was at the existing wetland which is directly opposite Daniel’s hall in the campus. The software used for transmission system is WaterCAD, which was used to design the flow path network from the lowest elevation to the highest elevation point. The water storage facility design software used are Staad pro., Orion, and AutoCAD. Staad pro. Was used to analyse and design for the underground water tank, and the elevated steel water tank, while Orion software was used for concrete design and it was used to detail the underground water tank. The result gotten from all the design software were imported to AutoCAD software for editing, scaling, and proper output result

    Diagnóstico del estado actual y proyectado a un período de diseño para la red de acueducto de la zona urbana del municipio de Madrid Cundinamarca

    Get PDF
    Gestión integral y dinámica de las organizaciones empresarialesMadrid se encuentra ubicado en el departamento de Cundinamarca y es uno de los municipios del occidente de la sabana, debido a su excelente localización es atractivo a las inversiones para el desarrollo urbanístico. Debido a esto, el municipio requiere brindar un servicio de acueducto eficiente y que cumpla con lo estipulado en la normatividad vigente, para este fin se propone realizar un análisis detallado del comportamiento y estado en el que se encuentra el sistema de abastecimiento de agua potable suministrado a la comunidad y verificar el cumplimiento o falencias en la prestación de este servicio la calidad de la prestación del servicio de acueducto debe estar acompañada por crecimiento del municipio, para lo anterior se hace necesario realizar un estudio del comportamiento de la red para un periodo de diseño adecuado.INTRODUCCIÓN 1. GENERALIDADES 2. OBJETIVOS 3. JUSTIFICACIÓN 4. ALCANCES Y LIMITACIONES 5. MARCO DE REFERENCIA 6. PROCEDIMIENTO PARA DIAGNOSTICO DE LA RED ACTUAL 7. PROCEDIMIENTO PARA DIAGNOSTICO DE LA RED PROYECTADA 8. ANÁLISIS DE RESULTADOS 9. CONCLUSIONES BIBLIOGRAFÍA ANEXOSPregradoIngeniero Civi

    Kajian Kelayakan Pemanfaatan Suplai Air Baku Sistem Transmisi Jalur Eksisting Pdab Tirta Utama Jateng Unit Bregas sebagai Potensi Energi Listrik

    Full text link
    Keberadaan air pada kehidupan manusia sangatlah penting. Air merupakan salah satu sumber daya alam di Indonesia yang yang dapat digunakan untuk bermacam-macam fungsi. Air digunakan untuk kebutuhan domestik, non domestik, perikanan, irigasi, pembangkit listrik dan lain-lain. Pada sistem transmisi air bersih yang berasal dari mata air daerah pegunungan umumnya memanfaatkan gaya gravitasi untuk mengalirkan air bersih seperti yang dilakukan oleh PDAB Jawa Tengah Unit Bregas. Sistem jaringan transmisi yang bersifat kontinyu dan adanya tekanan sisa pada setiap ruas merupakan faktor penunjang untuk dapat dimanfaatkan sebagai penghasil daya listrik. Semakin besar debit dan sisa tekan akan menghasilkan daya listrik yang semakin besar pula. Untuk sistem transmisi jalur eksisting ini dapat menghasilkan menghasilkan daya listrik sebesar 212,7 kW pada ruas antara BPT 5 dan BPT 6. Pertimbangan-pertimbangan lainnya dalam penentuan lokasi pembangunan PLTMH meliputi faktor sosial, ekonomi serta teknis

    Perencanaan Sistem Penyediaan Air Minum (SPAM) di Kecamatan Bukit Raya Kota Pekanbaru

    Full text link
    Clean water is one of the basic human needs as required continuously in daily activities. Clean water demand increase along with population growth and the development of urban and rural areas. While the water supply is still very limited so that urban and rural populations are still many who have not been able to enjoy clean water. Bukit Raya sub-district has a source of raw water source, it is the river Sail as a source of clean water to sufficient of clean water every day.Water supply systems are planned to sufficient the needs of clean water in the District of Bukit Raya until 2028. The clean water demand is calculated based on the projected number of people using the Least Square method. From based calculation, the predicted number of District residents Bukit Raya until 2028 amounted to 137.680 inhabitants and for the clean water demand reaches 206,30 l /sec. Results of laboratory tests of water quality, some of the parameters that does not comply with quality standards, such as pH, BOD, COD, DO, NH3, nitrogen, iron, sulfur as H2S, and total coliform. Therefore, to make use of Sail River as raw water is required treatmant processing. The processing units are intakes, neutralization, coagulation, flocculation, sedimentation, filtration, and reservoir. To design a pipe of water supply system is using Epanet 2.0 software. The type of pipe is HDPE. The cost required to construct Planning Water Supply System is Rp. 17,111,115,300
    corecore