2 research outputs found

    Flowshop Scheduling Problems with a Position-Dependent Exponential Learning Effect

    Get PDF
    We consider a permutation flowshop scheduling problem with a position-dependent exponential learning effect. The objective is to minimize the performance criteria of makespan and the total flow time. For the two-machine flow shop scheduling case, we show that Johnson’s rule is not an optimal algorithm for minimizing the makespan given the exponential learning effect. Furthermore, by using the shortest total processing times first (STPT) rule, we construct the worst-case performance ratios for both criteria. Finally, a polynomial-time algorithm is proposed for special cases of the studied problem

    Note on a Single-Machine Scheduling Problem with Sum of Processing Times Based Learning and Ready Times

    Get PDF
    In the recent 20 years, scheduling with learning effect has received considerable attention. However, considering the learning effect along with release time is limited. In light of these observations, in this paper, we investigate a single-machine problem with sum of processing times based learning and ready times where the objective is to minimize the makespan. For solving this problem, we build a branch-and-bound algorithm and a heuristic algorithm for the optimal solution and near-optimal solution, respectively. The computational experiments indicate that the branch-and-bound algorithm can perform well the problem instances up to 24 jobs in terms of CPU time and node numbers, and the average error percentage of the proposed heuristic algorithm is less than 0.5%
    corecore