34,434 research outputs found

    Strengthening Construction Management in the Rural Rehab Line of Business

    Get PDF
    The Five Key ObservationsObservation#1: Rural rehab success emanated from positive thinking and persistent implementationObservation #2: Almost every RHRO would benefit from a substantial increase in the per unit funding available, especially in light of the forthcoming HUD HOME requirement to establish written rehab standards in ten subcategories.Observation #3: A smartphone and tablet with 20 to 40 apps is the rehab specialist's Swiss Army knife. They are our, GPS, calculator, spec writer, office lifeline in case of danger, camera, clock, cost estimator calendar and a hundred other single-purpose but very important uses.Observation #4: NeighborWorks® Rural Initiative could provide a clearinghouse for success techniques targeted to rural rehab. Each month it might focus on a specific aspect of rehab management; inspection checklists in January, green specs in February, feasibility checklist in March, contractor qualification questionnaires in April and so on.Observation #5: Even with most components of in-house contractor success formula in place, per the Statistic Research Institute 53% of construction firms go out of business with in the first 4 years. It remains a very risky model that requires significant; funding, staff experience, administrative support and risk tolerance.Three Rehab Production Models And Their AlternativesThis middle section restates the introduction and methodology and offers a detailed review of the Traditional Rehab Specialist, Construction Management Of Subcontractor and the In-House General Contractor production models .for each model the article provides: definition and staffing pattern, design roles and tasks for each major player, benefits and challenges, alternative models and finally recommendations for successful implementationFocus TopicsDuring our interview process, three ideas surfaced that were best served with a mini discussion of the topic rather than being embedded in the already large middle section.The three topics are; software and technology, management of community relations – marketing and quality control, and budget solution

    Search based software engineering: Trends, techniques and applications

    Get PDF
    © ACM, 2012. This is the author's version of the work. It is posted here by permission of ACM for your personal use. Not for redistribution. The definitive version is available from the link below.In the past five years there has been a dramatic increase in work on Search-Based Software Engineering (SBSE), an approach to Software Engineering (SE) in which Search-Based Optimization (SBO) algorithms are used to address problems in SE. SBSE has been applied to problems throughout the SE lifecycle, from requirements and project planning to maintenance and reengineering. The approach is attractive because it offers a suite of adaptive automated and semiautomated solutions in situations typified by large complex problem spaces with multiple competing and conflicting objectives. This article provides a review and classification of literature on SBSE. The work identifies research trends and relationships between the techniques applied and the applications to which they have been applied and highlights gaps in the literature and avenues for further research.EPSRC and E

    Resource Allocation Planning Helper (RALPH): Lessons learned

    Get PDF
    The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility

    A survey of variants and extensions of the resource-constrained project scheduling problem

    Get PDF
    The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted numerous researchers who developed both exact and heuristic scheduling procedures. However, it is a rather basic model with assumptions that are too restrictive for many practical applications. Consequently, various extensions of the basic RCPSP have been developed. This paper gives an overview over these extensions. The extensions are classified according to the structure of the RCPSP. We summarize generalizations of the activity concept, of the precedence relations and of the resource constraints. Alternative objectives and approaches for scheduling multiple projects are discussed as well. In addition to popular variants and extensions such as multiple modes, minimal and maximal time lags, and net present value-based objectives, the paper also provides a survey of many less known concepts. --project scheduling,modeling,resource constraints,temporal constraints,networks

    Guide for users of the National Transonic Facility

    Get PDF
    The National Transonic Facility (NTF) is a fan-driven, closed-circuit, continuous flow, pressurized wind tunnel. The test section is 2.5 m x 2.5 m and 7.62 m long with a slotted-wall configuration. The NTF will have a Mach number range from 0.2 to 1.2, with Reynolds number up to 120 10 to the sixth power at Mach 1 (based on a reference length of 0.25 m). The pressure range for the facility will be from 1 to about 9 bars (1 ban = 100 kPa), and the temperature can be varied from 340 to 78 K. This report provides potential users of the NTF with the information required for preliminary planning to test programs and for preliminary layout of models and model supports which may be used in such programs

    A hierarchical approach to multi-project planning under uncertainty

    Get PDF
    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the various existing planning approaches. We discuss the current state of the art of hierarchical planning approaches both for traditional manufacturing and for project environments. We introduce a generic hierarchical project planning and control framework that serves to position planning methods for multi-project planning under uncertainty. We discuss multiple techniques for dealing with the uncertainty inherent to the different hierarchical stages in a multi-project organisation. In the last part of this paper we discuss two cases from practice and we relate these practical cases to the positioning framework that is put forward in the paper

    Application of expert systems in project management decision aiding

    Get PDF
    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method
    corecore