1,190,176 research outputs found
Fake-Acknowledgment Attack on ACK-based Sensor Power Schedule for Remote State Estimation
We consider a class of malicious attacks against remote state estimation. A
sensor with limited resources adopts an acknowledgement (ACK)-based online
power schedule to improve the remote state estimation performance. A malicious
attacker can modify the ACKs from the remote estimator and convey fake
information to the sensor. When the capability of the attacker is limited, we
propose an attack strategy for the attacker and analyze the corresponding
effect on the estimation performance. The possible responses of the sensor are
studied and a condition for the sensor to discard ACKs and switch from online
schedule to offline schedule is provided.Comment: submitted to IEEE CDC 201
Lighting as a Circadian Rhythm-Entraining and Alertness-Enhancing Stimulus in the Submarine Environment
The human brain can only accommodate a circadian rhythm that closely follows 24 hours. Thus, for a work schedule to meet the brain’s hard-wired requirement, it must employ a 24 hour-based program. However, the 6 hours on, 12 hours off (6/12) submarine watchstanding schedule creates an 18-hour “day” that Submariners must follow. Clearly, the 6/12 schedule categorically fails to meet the brain’s operational design, and no schedule other than one tuned to the brain’s 24 hour rhythm can optimize performance. Providing Submariners with a 24 hour-based watchstanding schedule—combined with effective circadian entrainment techniques using carefully-timed exposure to light—would allow crewmembers to work at the peak of their daily performance cycle and acquire more restorative sleep. In the submarine environment, where access to natural light is absent, electric lighting can play an important role in actively entraining—and closely maintaining—circadian regulation. Another area that is likely to have particular importance in the submarine environment is the potential effect of light to help restore or maintain alertness
Computerized Schedule Effectiveness Technique /SET/ determines present and future schedule position
Computerized scheduling system calculates an index of overall schedule-effectiveness. The schedule-effectiveness index is a measurement of actual overall performance against the existing schedule, and a series of schedule-effectiveness values indicates the trend of actual performance. This computer program is written in Fortran 4
Characterization, performance, and prediction of a lead-acid battery under simulated electric vehicle driving requirements
A state-of-the-art 6-V battery module in current use by the electric vehicle industry was tested at the NASA Lewis Research Center to determine its performance characteristics under the SAE J227a driving schedules B, C, and D. The primary objective of the tests was to determine the effects of periods of recuperation and long and short periods of electrical regeneration in improving the performance of the battery module and hence extendng the vehicle range. A secondary objective was to formulate a computer program that would predict the performance of this battery module for the above driving schedules. The results show excellent correlation between the laboratory tests and predicted results. The predicted performance compared with laboratory tests was within +2.4 to -3.7 percent for the D schedule, +0.5 to -7.1 percent for the C schedule, and better than -11.4 percent for the B schedule
System engineering techniques for establishing balanced design and performance guidelines for the advanced telerobotic testbed
Novel system engineering techniques have been developed and applied to establishing structured design and performance objectives for the Telerobotics Testbed that reduce technical risk while still allowing the testbed to demonstrate an advancement in state-of-the-art robotic technologies. To estblish the appropriate tradeoff structure and balance of technology performance against technical risk, an analytical data base was developed which drew on: (1) automation/robot-technology availability projections, (2) typical or potential application mission task sets, (3) performance simulations, (4) project schedule constraints, and (5) project funding constraints. Design tradeoffs and configuration/performance iterations were conducted by comparing feasible technology/task set configurations against schedule/budget constraints as well as original program target technology objectives. The final system configuration, task set, and technology set reflected a balanced advancement in state-of-the-art robotic technologies, while meeting programmatic objectives and schedule/cost constraints
Estimating the cost of major ongoing cost plus hardware development programs
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data
An assessment of PERT as a technique for schedule planning and control
The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject
My Final Scene
Morgan Gerke ’16 has always been an actor at heart, but her busy schedule didn’t allow her to participate in Linfield Theatre. Until now. From acting exercises, through exams and a final performance, she shares her January Term experience
- …
