Modeling and optimizing transmission lines with GIS and Multi-Criteria Decision Analysis
In planning transmission lines with the use of Geographic Information Systems, the use of the Least Cost Path (LCP) algorithm has been established while relevant criteria are modeled using Multi-Criteria Decision Analysis (MCDA). Despite their established use, this combination (MCDA/LCP) often leads to results that do not correspond to realistic conditions. Therefore, the MCDA/LCP computation must usually be optimized on an algorithmic level as well as on the decision model and the underlying data relevant for the MCDA. The current paper presents the state-of-the-art of an ongoing research project that aims to solve these issues. First results are promising since a stable algorithm has been developed that computes a cost surface, a Least Cost Corridor (LCC), a LCP, and the transmission towers' positions by simple additive weighting based on user's weights. Optimizations on the MCDA models have already been implemented and tested. The findings are integrated into a 3D Decision Support System which aims at facilitating the work of TL planners by realistic modeling and by reducing the approval process for new TL
Modeling and optimizing transmission lines with GIS and Multi-Criteria Decision Analysis
In planning transmission lines with the use of Geographic Information Systems, the use of the Least Cost Path (LCP) algorithm has been established while relevant criteria are modeled using Multi-Criteria Decision Analysis (MCDA). Despite their established use, this combination (MCDA/LCP) often leads to results that do not correspond to realistic conditions. Therefore, the MCDA/LCP computation must usually be optimized on an algorithmic level as well as on the decision model and the underlying data relevant for the MCDA. The current paper presents the stateof-the-art of an ongoing research project that aims to solve these issues. First results are promising since a stable algorithm has been developed that computes a cost surface, a Least Cost Corridor (LCC), a LCP, and the transmission towersβ positions by simple additive weighting based on userβs weights. Optimizations on the MCDA models have already been implemented and tested. The findings are integrated into a 3D Decision Support System which aims at facilitating the work of TL planners by realistic modeling and by reducing the approval process for new TL.ISSN:1611-2776ISSN:0179-973
Modeling and optimizing transmission lines with GIS and Multi-Criteria Decision Analysis
ISSN:1611-2776ISSN:0179-973
ΡΠ±ΠΎΡΠ½ΠΈΠΊ ΡΡΡΠ΄ΠΎΠ² VI ΠΌΠ΅ΠΆΠ΄ΡΠ½Π°ΡΠΎΠ΄Π½ΠΎΠΉ Π½Π°ΡΡΠ½ΠΎ-ΠΏΡΠ°ΠΊΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΠΊΠΎΠ½ΡΠ΅ΡΠ΅Π½ΡΠΈΠΈ, Π³. ΠΠ΅Π»Π³ΠΎΡΠΎΠ΄, 24 Π½ΠΎΡΠ±. 2023 Π³.
Π ΡΠ±ΠΎΡΠ½ΠΈΠΊΠ΅ ΠΎΠΏΡΠ±Π»ΠΈΠΊΠΎΠ²Π°Π½Ρ ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π»Ρ ΠΌΠ΅ΠΆΠ΄ΡΠ½Π°ΡΠΎΠ΄Π½ΠΎΠΉ Π½Π°ΡΡΠ½ΠΎ-ΠΏΡΠ°ΠΊΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΠΊΠΎΠ½ΡΠ΅ΡΠ΅Π½ΡΠΈΠΈ, ΠΏΡΠΎΠ²Π΅Π΄Π΅Π½Π½ΠΎΠΉ Π² ΠΠ½ΡΡΠΈΡΡΡΠ΅ ΡΠΊΠΎΠ½ΠΎΠΌΠΈΠΊΠΈ ΠΈ ΡΠΏΡΠ°Π²Π»Π΅Π½ΠΈΡ ΠΠΠ£ "ΠΠ΅Π»ΠΠ£" 24 Π½ΠΎΡΠ±ΡΡ 2023 Π³ΠΎΠ΄Π°. ΠΠ½Π°ΡΠΈΡΠ΅Π»ΡΠ½Π°Ρ ΡΠ°ΡΡΡ ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π»ΠΎΠ² ΠΎΡΡΠ°ΠΆΠ°Π΅Ρ ΡΠ΅ΠΎΡΠ΅ΡΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΠΈ ΠΏΡΠ°ΠΊΡΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΡΠ΅Π·ΡΠ»ΡΡΠ°ΡΡ Π½Π°ΡΡΠ½ΡΡ
Π΄ΠΎΡΡΠΈΠΆΠ΅Π½ΠΈΠΉ ΠΏΡΠ΅ΠΏΠΎΠ΄Π°Π²Π°ΡΠ΅Π»Π΅ΠΉ, ΠΌΠ°Π³ΠΈΡΡΡΠ°Π½ΡΠΎΠ², Π°ΡΠΏΠΈΡΠ°Π½ΡΠΎΠ² ΠΈ ΠΏΡΠ°ΠΊΡΠΈΡΠ΅ΡΠΊΠΈΡ
ΡΠ°Π±ΠΎΡΠ½ΠΈΠΊΠΎΠ² Π² ΠΎΠ±Π»Π°ΡΡΠΈ ΠΏΡΠΎΡΡΡΠ°Π½ΡΡΠ²Π΅Π½Π½ΠΎΠΉ ΡΠΊΠΎΠ½ΠΎΠΌΠΈΠΊ