3 research outputs found

    Decision-making under risk and uncertainty and its application in strategic management

    Get PDF
    We introduce a new decision-making model that unifies risk and uncertain environments in the same formulation. For doing so, we present the induced probabilistic ordered weighted averaging (IPOWA) operator. It is an aggregation operator that unifies the probability with the OWA operator in the same formulation and considering the degree of importance of each concept in the aggregation. Moreover, it also uses induced aggregation operators that provide a more general representation of the attitudinal character of the decision-maker. We study its applicability and we see that it is very broad because all the previous studies that use the probability or the OWA operator can be revised and extended with this new approach. We briefly analyze some basic applications in statistics such as the implementation of this approach with the variance, the covariance, the Pearson coefficient and in a simple linear regression model. We focus on a multi-person decision-making problem in strategic management. Thus, we are able to construct a new aggregation operator that we call the multi-person IPOWA operator. Its main advantage is that it can deal with the opinion of several persons in the analysis so we can represent the information in a more complete way

    Improved risk analysis for large projects: Bayesian networks approach

    Get PDF
    PhDGenerally risk is seen as an abstract concept which is difficult to measure. In this thesis, we consider quantification in the broader sense by measuring risk in the context of large projects. By improved risk measurement, it may be possible to identify and control risks in such a way that the project is completed successfully in spite of the risks. This thesis considers the trade-offs that may be made in project risk management, specifically time, cost and quality. The main objective is to provide a model which addresses the real problems and questions that project managers encounter, such as: • If I can afford only minimal resources, how much quality is it possible to achieve? • What resources do I need in order to achieve the highest quality possible? • If I have limited resources and I want the highest quality, how much functionality do I need to lose? We propose the use of a causal risk framework that is an improvement on the traditional modelling approaches, such as the risk register approach, and therefore contributes to better decision making. The approach is based on Bayesian Networks (BNs). BNs provide a framework for causal modelling and offer a potential solution to some of the classical modelling problems. Researchers have recently attempted to build BN models that incorporate relationships between time, cost, quality, functionality and various process variables. This thesis analyses such BN models and as part of a new validation study identifies their strengths and weaknesses. BNs have shown considerable promise in addressing the aforementioned problems, but previous BN models have not directly solved the trade-off problem. Major weaknesses are that they do not allow sensible risk event measurement and they do not allow full trade-off analysis. The main hypothesis is that it is possible to build BN models that overcome these limitations without compromising their basic philosophy

    Including decision attitude in probabilistic decision making

    No full text
    corecore