2 research outputs found
Complexity and Inapproximability Results for Parallel Task Scheduling and Strip Packing
We study the Parallel Task Scheduling problem with a
constant number of machines. This problem is known to be strongly NP-complete
for each , while it is solvable in pseudo-polynomial time for each . We give a positive answer to the long-standing open question whether
this problem is strongly -complete for . As a second result, we
improve the lower bound of for approximating pseudo-polynomial
Strip Packing to . Since the best known approximation algorithm
for this problem has a ratio of , this result
narrows the gap between approximation ratio and inapproximability result by a
significant step. Both results are proven by a reduction from the strongly
-complete problem 3-Partition