1,878 research outputs found

    A Time-driven Data Placement Strategy for a Scientific Workflow Combining Edge Computing and Cloud Computing

    Full text link
    Compared to traditional distributed computing environments such as grids, cloud computing provides a more cost-effective way to deploy scientific workflows. Each task of a scientific workflow requires several large datasets that are located in different datacenters from the cloud computing environment, resulting in serious data transmission delays. Edge computing reduces the data transmission delays and supports the fixed storing manner for scientific workflow private datasets, but there is a bottleneck in its storage capacity. It is a challenge to combine the advantages of both edge computing and cloud computing to rationalize the data placement of scientific workflow, and optimize the data transmission time across different datacenters. Traditional data placement strategies maintain load balancing with a given number of datacenters, which results in a large data transmission time. In this study, a self-adaptive discrete particle swarm optimization algorithm with genetic algorithm operators (GA-DPSO) was proposed to optimize the data transmission time when placing data for a scientific workflow. This approach considered the characteristics of data placement combining edge computing and cloud computing. In addition, it considered the impact factors impacting transmission delay, such as the band-width between datacenters, the number of edge datacenters, and the storage capacity of edge datacenters. The crossover operator and mutation operator of the genetic algorithm were adopted to avoid the premature convergence of the traditional particle swarm optimization algorithm, which enhanced the diversity of population evolution and effectively reduced the data transmission time. The experimental results show that the data placement strategy based on GA-DPSO can effectively reduce the data transmission time during workflow execution combining edge computing and cloud computing

    A Petri net simulation model for virtual construction of earthmoving operations

    Get PDF
    A common and extended Petri net simulation framework for virtual construction of earthmoving operations is developed to simulate dynamic changes of workflow and information flow in the earthmoving construction process and illustrate the constraint relationship between various operational equipment and construction restrictions. The proposed framework considers factors that influence earthmoving operations including randomness of construction activities, individual preference of equipment scheduling, and constraint relationship between equipment and construction environment. With the given equipment availability and project indirect cost, the framework can predict construction situation, equipment utilization rate, estimated duration and cost to achieve visualized and intelligent scheduling of virtual construction process in earthmoving operations. The simulation process is conducted on the CPNTools platform. The data required by the research were collected on-site in an actual case. The randomness of construction activities in earthmoving operations and main factors influencing construction are simulated. The sensitivity analysis for the model is carried out. The study will provide technical support and a management basis for equipment scheduling of earthmoving operations

    Methods and Formal Models for Healthcare Systems Management

    Get PDF
    A healthcare system is an organization of people, institutions, and resources that deliver healthcare services to meet the health needs of target populations. The size of the systems, the huge number of agents involved and their different expectations make the management of healthcare systems a tough task which could be alleviated through the use of technology. In this thesis, new methods and formal models for healthcare system management are presented. Particularly, the thesis is divided in two main parts: the first one has to do with the modeling and analysis in hospitals by the use of clinical pathways while the second one deals with the planning and scheduling of patients in the operation rooms.Regarding the modeling and analysis of healthcare systems, depending on different visions and expectations, the system can be treated from different perspectives called facets. In chapter 2, the formal definition and characterization of two facets are given: (1) facet of resource management and (2) handshake between clinical pathways facet. They are obtained by applying to Stochastic Well-formed Nets (colored Petri Nets) modeling the healthcare system a set of relaxations, abstraction and modifications. In the first facet the subclass of S4PR is obtained which is a characteristic model of the resource allocation systems while in the second facet Deterministically Synchronized Sequential Process (DSSP) are considered. Both nets (S4PR and DSSP) are formal subclasses of Petri Nets where net level techniques can be applied.In chapters 3 and 4, we will focus on the liveness of the DSSP systems resulting from the facet of communication between clinical pathways. These kinds of nets are composed by agents (modeling clinical pathways) cooperating in a distributed way by the asynchronous messaging passing through the buffers (modeling the communication channels). In particular two approaches have been proposed.The idea behind the first approach is to advance the buffer consumption to the first conflict transition in the agents. Considering healthcare systems modeled by a DSSP, this means that before a patient starts a clinical pathway, all required information must be available. Unfortunately, this pre-assignment method only works in some particular DSSP structures which are characterized. A more general approach (than buffer pre-assignment) for liveness enforcing in non-live DSSP is given in Chapter. 4. The approach is formalized on two levels: execution and control. The execution level uses the original DSSP structure while for the control level we compute a new net system called the control PN. This net system is obtained from the original DSSP and has a predefined type of structure. The control PN will evolve synchronously with the non-live DSSP ensuring that the deadlock states will not be reached. The states (marking) of the control PN will enable or disable some transitions in the original DSSP, while some transitions in the control PN should fire synchronously with some transitions of the original DSSP.The second part of the thesis deals with surgery scheduling of patients in a hospital department. The Operating Rooms (ORs) are one of the most expensive material resources in hospitals, being the bottleneck of surgical services. Moreover, the aging population together with the improvement in surgical techniques are producing an increase in the demand for surgeries. So, the optimal use of the ORs time is crucial inhealthcare service management. We focus on the planning and scheduling of patients in Spanish hospital departments considering its organizational structure particularities as well as the concerns and specifications of their doctors.In chapter 5, the scheduling of elective patients under ORs block booking is considered. The first criterion is to optimize the use of the OR, the second criterion is to prevent that the total available time in a block will be exceeded and the third criterion is to respect the preference order of the patient in the waiting list. Three different mathematical programming models for the scheduling of elective patients are proposed. These are combinatorial problems with high computational complexity, so three different heuristic solution methods are proposed and compared. The results show that a Mixed Integer Linear Programming (MILP) problem solved by Receding Horizon Strategy (RHS)obtains better scheduling in lowest time.Doctors using the MILP problem must fix an appropriate occupation rate for optimizing the use of the ORs but without exceeding the available time. This has two main problems: i) inexperienced doctors could find difficult to fix an appropriate occupation rate, and ii) the uncertain in the surgery durations (large standard deviation) could results in scheduling with an over/under utilization. In order to overcome these problems, a New Mixed-Integer Quadratic Constrained Programming (N-MIQCP) model is proposed. Considering some probabilistic concepts, quadratic constraints are included in N-MIQCP model to prevent the scheduling of blocks with a high risk of exceeding the available time. Two heuristic methods for solving the N-MIQCP problem are proposed and compared with other chance-constrained approaches in bibliography. The results conclude that the best schedulings are achieved using our Specific Heuristic Algorithm (SHA) due to similar occupation rates than using other approaches are obtained but our SHA respects much more the order of the patients in the waiting list.In chapter 6, a three steps approach is proposed for the combined scheduling of elective and urgent patients. In the first step, the elective patients are scheduled for a target Elective Surgery Time (EST) in the ORs, trying to respect the order of the patients on the waiting list. In the second one, the urgent patients are scheduled in the remaining time ensuring that an urgent patient does not wait more than 48 hours. Finally, in the third step, the surgeries assigned to each OR (elective and urgent) are sequenced in such a way that the maximum time that an emergency patient should wait is minimized. Considering realistic data, different policies of time reserved in the ORs for elective and urgent patients are evaluated. The results show that all ORs must be used to perform elective and urgent surgeries instead of reserving some ORs exclusively for one type of patient.Finally, in chapter 7 a software solution for surgery service management is given. A Decision Support System for elective surgery scheduling and a software tool called CIPLAN are proposed. The DSS use as core the SHA for the scheduling of elective patients, but it has other features related to the management of a surgery department. A software tool called CIPLAN which is based on the DSS is explained. The software tool has a friendly interface which has been developed in collaboration with doctors in the “Lozano Blesa” Hospital in Zaragoza. A real case study comparing the scheduling using the manual method with the scheduling obtained by using CIPLAN is discussed. The results show that 128.000 euros per year could be saved using CIPLAN in the mentioned hospital. Moreover, the use of the tool allows doctors to reduce the time spent in scheduling to use it medical tasks.<br /

    A framework for smart production-logistics systems based on CPS and industrial IoT

    Get PDF
    Industrial Internet of Things (IIoT) has received increasing attention from both academia and industry. However, several challenges including excessively long waiting time and a serious waste of energy still exist in the IIoT-based integration between production and logistics in job shops. To address these challenges, a framework depicting the mechanism and methodology of smart production-logistics systems is proposed to implement intelligent modeling of key manufacturing resources and investigate self-organizing configuration mechanisms. A data-driven model based on analytical target cascading is developed to implement the self-organizing configuration. A case study based on a Chinese engine manufacturer is presented to validate the feasibility and evaluate the performance of the proposed framework and the developed method. The results show that the manufacturing time and the energy consumption are reduced and the computing time is reasonable. This paper potentially enables manufacturers to deploy IIoT-based applications and improve the efficiency of production-logistics systems

    Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation

    Get PDF
    Autonomous guided vehicles (AGVs) are driverless material handling systems used for transportation of pallets and line side supply of materials to provide flexibility and agility in shop-floor logistics. Scheduling of shop-floor logistics in such systems is a challenging task due to their complex nature associated with the multiple part types and alternate material transfer routings. This paper presents a decision support system capable of supporting shop-floor decision-making activities during the event of manufacturing disruptions by automatically adjusting both AGV and machine schedules in Flexible Manufacturing Systems (FMSs). The proposed system uses discrete event simulation (DES) models enhanced by the Internet-of-Things (IoT) enabled digital integration and employs a nonlinear mixed integer programming Genetic Algorithm (GA) to find near-optimal production schedules prioritising the just-in-time (JIT) material delivery performance and energy efficiency of the material transportation. The performance of the proposed system is tested on the Integrated Manufacturing and Logistics (IML) demonstrator at WMG, University of Warwick. The results showed that the developed system can find the near-optimal solutions for production schedules subjected to production anomalies in a negligible time, thereby supporting shop-floor decision-making activities effectively and rapidly

    Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation

    Get PDF
    © 2020 by the authors. Licensee MDPI, Basel, Switzerland. Autonomous guided vehicles (AGVs) are driverless material handling systems used for transportation of pallets and line side supply of materials to provide flexibility and agility in shop-floor logistics. Scheduling of shop-floor logistics in such systems is a challenging task due to their complex nature associated with the multiple part types and alternate material transfer routings. This paper presents a decision support system capable of supporting shop-floor decision-making activities during the event of manufacturing disruptions by automatically adjusting both AGV and machine schedules in Flexible Manufacturing Systems (FMSs). The proposed system uses discrete event simulation (DES) models enhanced by the Internet-of-Things (IoT) enabled digital integration and employs a nonlinear mixed integer programming Genetic Algorithm (GA) to find near-optimal production schedules prioritising the just-in-time (JIT) material delivery performance and energy efficiency of the material transportation. The performance of the proposed system is tested on the Integrated Manufacturing and Logistics (IML) demonstrator at WMG, University of Warwick. The results showed that the developed system can find the near-optimal solutions for production schedules subjected to production anomalies in a negligible time, thereby supporting shop-floor decision-making activities effectively and rapidly

    Enhancing the performance of automated guided vehicles through reliability, operation and maintenance assessment

    Get PDF
    Automated guided vehicles (AGVs), a type of unmanned moving robots that move along fixed routes or are directed by laser navigation systems, are increasingly used in modern society to improve efficiency and lower the cost of production. A fleet of AGVs operate together to form a fully automatic transport system, which is known as an AGV system. To date, their added value in efficiency improvement and cost reduction has been sufficiently explored via conducting in-depth research on route optimisation, system layout configuration, and traffic control. However, their safe application has not received sufficient attention although the failure of AGVs may significantly impact the operation and efficiency of the entire system. This issue becomes more markable today particularly in the light of the fact that the size of AGV systems is becoming much larger and their operating environment is becoming more complex than ever before. This motivates the research into AGV reliability, availability and maintenance issues in this thesis, which aims to answer the following four fundamental questions: (1) How could AGVs fail? (2) How is the reliability of individual AGVs in the system assessed? (3) How does a failed AGV affect the operation of the other AGVs and the performance of the whole system? (4) How can an optimal maintenance strategy for AGV systems be achieved? In order to answer these questions, the method for identifying the critical subsystems and actions of AGVs is studied first in this thesis. Then based on the research results, mathematical models are developed in Python to simulate AGV systems and assess their performance in different scenarios. In the research of this thesis, Failure Mode, Effects and Criticality Analysis (FMECA) was adopted first to analyse the failure modes and effects of individual AGV subsystems. The interactions of these subsystems were studied via performing Fault Tree Analysis (FTA). Then, a mathematical model was developed to simulate the operation of a single AGV with the aid of Petri Nets (PNs). Since most existing AGV systems in modern industries and warehouses consist of multiple AGVs that operate synchronously to perform specific tasks, it is necessary to investigate the interactions between different AGVs in the same system. To facilitate the research of multi-AGV systems, the model of a three-AGV system with unidirectional paths was considered. In the model, an advanced concept PN, namely Coloured Petri Net (CPN), was creatively used to describe the movements of the AGVs. Attributing to the application of CPN, not only the movements of the AGVs but also the various operation and maintenance activities of the AGV systems (for example, item delivery, corrective maintenance, periodic maintenance, etc.) can be readily simulated. Such a unique technique provides us with an effective tool to investigate larger-scale AGV systems. To investigate the reliability, efficiency and maintenance of dynamic AGV systems which consist of multiple single-load and multi-load AGVs traveling along different bidirectional routes in different missions, an AGV system consisting of 9 stations was simulated using the CPN methods. Moreover, the automatic recycling of failed AGVs is studied as well in order to further reduce human participation in the operation of AGV systems. Finally, the simulation results were used to optimise the design, operation and maintenance of multi-AGV systems with the consideration of the throughputs and corresponding costs of them.The research reported in this thesis contributes to the design, reliability, operation, and maintenance of large-scale AGV systems in the modern and rapidly changing world.</div

    Scheduling With Alternatives Machine Using Fuzzy Inference System And Genetic Algorithm.

    Get PDF
    As the manufacturing activities in today's industries are getting more and more complex, it is required for the manufacturing company to have a good shop floor production scheduling to plan and schedule their production orders. Industri pengeluarcim kini telah berkembang pesat dan aktiviti pengeluarannya semakin kompleks, dengan itu syarikat pengeluar memerlukan jadual lantai pengeluaran (shop floor) yang terbaik untuk merancang permintaan pengeluaran (product)

    A Review of Control Techniques for Wind Energy Conversion System

    Get PDF
    Wind energy is the most efficient and advanced form of renewable energy (RE) in recent decades, and an effective controller is required to regulate the power generated by wind energy. This study provides an overview of state-of-the-art control strategies for wind energy conversion systems (WECS). Studies on the pitch angle controller, the maximum power point tracking (MPPT) controller, the machine side controller (MSC), and the grid side controller (GSC) are reviewed and discussed. Related works are analyzed, including evolution, software used, input and output parameters, specifications, merits, and limitations of different control techniques. The analysis shows that better performance can be obtained by the adaptive and soft-computing based pitch angle controller and MPPT controller, the field-oriented control for MSC, and the voltage-oriented control for GSC. This study provides an appropriate benchmark for further wind energy research