3 research outputs found

    Impact estimation: IT priority decisions

    Get PDF
    Given resource constraints, prioritization is a fundamental process within systems engineering to decide what to implement. However, there is little guidance about this process and existing IT prioritization methods have several problems, including failing to adequately cater for stakeholder value. In response to these issues, this research proposes an extension to an existing prioritization method, Impact Estimation (IE) to create Value Impact Estimation (VIE). VIE extends IE to cater for multiple stakeholder viewpoints and to move towards better capture of explicit stakeholder value. The use of metrics offers VIE the means of expressing stakeholder value that relates directly to real world data and so is informative to stakeholders and decision makers. Having been derived from prioritization factors found in the literature, stakeholder value has been developed into a multi-dimensional, composite concept, associated with other fundamental system concepts: objectives, requirements, designs, increment plans, increment deliverables and system contexts. VIE supports the prioritization process by showing where the stakeholder value resides for the proposed system changes. The prioritization method was proven to work by exposing it to three live projects, which served as case studies to this research. The use of the extended prioritization method was seen as very beneficial. Based on the three case studies, it is possible to say that the method produces two major benefits: the calculation of the stakeholder value to cost ratios (a form of ROI) and the system understanding gained through creating the VIE table

    First Workshop on the Economics of Software and Computation

    No full text
    corecore