4,022 research outputs found

    Pavement testing by integrated geophysical methods: Feasibility, resolution and diagnostic potential

    Get PDF
    This work is focused on the assessment of the diagnostic potential of several geophysical methods when applied to the investigation of a rigid airport pavement. The potential and limit of each technique are evaluated as well as the added value deriving from their integration. Firstly, we reconstruct a high-resolution image of the pavement by a large electromagnetic and georadar screening. An advanced processing of georadar data, implemented through the picking of the arrival times of reflections for each profile, provides a quantitative estimation of the deviation between the design and the as-built thickness of layers. Additionally, electrical tomography has been applied to unequivocally identify the anomalous zones, where higher values of resistivity would be associated to porous zones that are prone to degradation and failure. The seismic tomographic survey had the additional purpose to recover the mechanical properties of the pavement in terms of both P- and S-waves and consequently of elastic constants (Poisson's ratio), whose values were consistent with those recovered in literature. The anomalies detected by each technique are consistent in their indications and they can be correlated to failure phenomena occurring at layer interfaces within the pavement structure or to unexpected variations of the layer thicknesses. The cost-effective geophysical campaign has validated the four-layered system deduced from the original design and has been used to reconstruct a high-resolution map of the pavement in order to discriminate fractures, crack-prone areas or areas where the as-built differs from the original design

    Performance Evaluation of Open Graded Base Course with Doweled and Non-Doweled Transverse Joints

    Get PDF
    The objectives of this study were to investigate the performance of 20-year old doweled/non-doweled and dense-graded/permeable base test sections on three concrete pavement segments in Wisconsin: USH 18/151 in Iowa and Dane counties, STH 29 in Brown County, and USH 151 in Columbia and Dane Counties. Five pavement bases were placed including: dense graded, asphalt-stabilized permeable, cement-stabilized permeable, and untreated permeable having two gradation sizes. USH 18/151 test sections had similar performance (PDI) for doweled unsealed pavement on dense and permeable base. Distresses common to all segments included slight to moderate distressed joints/cracks and slight transverse faulting. Asphalt-stabilized permeable base had no slab breakup or surface distresses, however it measured a greater severity of distressed joints and cracks. Non-doweled sections having asphalt-stabilized permeable base and Transverse Inter Channel drains had better performance and ride than the other non-doweled sections. IRI was generally higher on non-doweled pavements, but many doweled sections had an equal roughness to non-doweled sections. Sealed non-doweled joints produced a better performing pavement, however, sealant did not appear to improve ride. STH 29 unsealed sections performed better than the median PDI for the sealed sections. The sealed doweled pavement did perform a little better than the non-doweled section, but the opposite occurred on the non-doweled sections. Sealed doweled joints had a smoother ride than the other combinations. USH 151 test sections found the finer-graded New Jersey permeable base had the smoothest ride when compared to other permeable sections. Asphalt-stabilized permeable base had the roughest ride, and unstabilized and cement-stabilized permeable bases had intermediate values. The average hydraulic conductivity for the unstabilized permeable base was 17,481 feet per day and there appears little variation due to doweling or joint sealant. Deflection load transfer results indicate expected high average values for the doweled sections and fair to poor values for the non-doweled sections. Slab support ratios indicate variable results based on base type and joint reinforcement/sealant. Life-cycle cost analysis found dense-graded base was the least cost among all base alternatives, with a total estimated present-worth life-cycle cost of $665,133 per roadway mile. Untreated and asphalt-stabilized permeable bases were more expensive by 13% and 27%, respectively. Other factors in selecting dense-graded base over permeable base include project drainage conditions set forth in the FDM guidelines an anticipated increase in pavement surface roughness

    Laboratory and on-site tests for rapid runway repair

    Get PDF
    The attention to rapid pavement repair has grown fast in recent decades: this topic is strategic for the airport management process for civil purposes and peacekeeping missions. This work presents the results of laboratory and on-site tests for rapid runway repair, in order to analyse and compare technical and mechanical performances of 12 different materials currently used in airport. The study focuses on site repairs, a technique adopted most frequently than repairs with modular elements. After describing mechanical and physical properties of the examined materials (2 bituminous emulsions, 5 cement mortars, 4 cold bituminous mixtures and 1 expanding resin), the study presents the results of carried out mechanical tests. The results demonstrate that the best performing material is a one-component fast setting and hardening cement mortar with graded aggregates. This material allows the runway reopening 6 h after the work. A cold bituminous mixture (bicomponent premixed cold asphalt with water as catalyst) and the ordinary cement concrete allow the reopening to traffic after 18 h, but both ensure a lower service life (1000 coverages) than the cement mortar (10,000 coverages). The obtained results include important information both laboratory level and field, and they could be used by airport management bodies and road agencies when scheduling and evaluating pavement repairs

    Georadar: le proprietà meccaniche della sovrastruttura stradale

    Get PDF
    L’ indagine preventiva delle caratteristiche prestazionali di una pavimentazione stradale risulta di prioritaria importanza nella corretta implementazione di un efficace sistema di manutenzione programmata delle strade o Pavement Management System (PMS), in quanto la determinazione della soluzione manutentiva più idonea può consentire un notevole contenimento dei costi di intervento, specialmente ove questi siano legati ad operazioni di ripristino e riabilitazione delle condizioni strutturali di origine

    Influence of high water contents on pavement layers stiffness caused by flooding

    Get PDF
    Moisture inside the construction of road pavements is the problem for road engineers all around the world. This issue is mentioned in many European or the US papers and studies, but still it needs to be developed. From the road engineers’ point of view, very important for solving above problems are the studies on the influence of water and moisture inside the construction of road pavement during deflection measurements using Falling Weight Deflectometer (FWD). The paper raises this issue by showing a short review of Polish and foreign literature and presenting the first step of research work at the test site on Voivodeship Road 933 in Poland

    Research News, November 2010

    Get PDF
    Newsletter of the Iowa Department of Transportation's Research and Technology Burea

    Analysis of pavement condition survey data for effective implementation of a network level pavement management program for Kazakhstan

    Get PDF
    Pavement roads and transportation systems are crucial assets for promoting political stability, as well as economic and sustainable growth in developing countries. However, pavement maintenance backlogs and the high capital costs of road rehabilitation require the use of pavement evaluation tools to assure the best value of the investment. This research presents a methodology for analyzing the collected pavement data for the implementation of a network level pavement management program in Kazakhstan. This methodology, which could also be suitable in other developing countries’ road networks, focuses on the survey data processing to determine cost-effective maintenance treatments for each road section. The proposed methodology aims to support a decision-making process for the application of a strategic level business planning analysis, by extracting information from the survey data
    corecore