20,734 research outputs found
Scheduling policies and system software architectures for mixed-criticality computing
Mixed-criticality model of computation is being increasingly
adopted in timing-sensitive systems. The model not only
ensures that the most critical tasks in a system never fails,
but also aims for better systems resource utilization in normal condition. In this report, we describe the widely used
mixed-criticality task model and fixed-priority scheduling
algorithms for the model in uniprocessors. Because of the
necessity by the mixed-criticality task model and scheduling
policies, isolation, both temporal and spatial, among tasks is
one of the main requirements from the system design point
of view. Different virtualization techniques have been used
to design system software architecture with the goal of isolation. We discuss such a few system software architectures
which are being and can be used for mixed-criticality model
of computation
TANGO: Transparent heterogeneous hardware Architecture deployment for eNergy Gain in Operation
The paper is concerned with the issue of how software systems actually use
Heterogeneous Parallel Architectures (HPAs), with the goal of optimizing power
consumption on these resources. It argues the need for novel methods and tools
to support software developers aiming to optimise power consumption resulting
from designing, developing, deploying and running software on HPAs, while
maintaining other quality aspects of software to adequate and agreed levels. To
do so, a reference architecture to support energy efficiency at application
construction, deployment, and operation is discussed, as well as its
implementation and evaluation plans.Comment: Part of the Program Transformation for Programmability in
Heterogeneous Architectures (PROHA) workshop, Barcelona, Spain, 12th March
2016, 7 pages, LaTeX, 3 PNG figure
A Benes Based NoC Switching Architecture for Mixed Criticality Embedded Systems
Multi-core, Mixed Criticality Embedded (MCE) real-time systems require high
timing precision and predictability to guarantee there will be no interference
between tasks. These guarantees are necessary in application areas such as
avionics and automotive, where task interference or missed deadlines could be
catastrophic, and safety requirements are strict. In modern multi-core systems,
the interconnect becomes a potential point of uncertainty, introducing major
challenges in proving behaviour is always within specified constraints,
limiting the means of growing system performance to add more tasks, or provide
more computational resources to existing tasks.
We present MCENoC, a Network-on-Chip (NoC) switching architecture that
provides innovations to overcome this with predictable, formally verifiable
timing behaviour that is consistent across the whole NoC. We show how the
fundamental properties of Benes networks benefit MCE applications and meet our
architecture requirements. Using SystemVerilog Assertions (SVA), formal
properties are defined that aid the refinement of the specification of the
design as well as enabling the implementation to be exhaustively formally
verified. We demonstrate the performance of the design in terms of size,
throughput and predictability, and discuss the application level considerations
needed to exploit this architecture
A Lazy Bailout Approach for Dual-Criticality Systems on Uniprocessor Platforms
© 2019 by the authors. Licensee MDPI, Basel, Switzerland.A challenge in the design of cyber-physical systems is to integrate the scheduling of tasks of different criticality, while still providing service guarantees for the higher critical tasks in case of resource-shortages caused by faults. While standard real-time scheduling is agnostic to the criticality of tasks, the scheduling of tasks with different criticalities is called mixed-criticality scheduling. In this paper we present the Lazy Bailout Protocol (LBP), a mixed-criticality scheduling method where low-criticality jobs overrunning their time budget cannot threaten the timeliness of high-criticality jobs while at the same time the method tries to complete as many low-criticality jobs as possible. The key principle of LBP is instead of immediately abandoning low-criticality jobs when a high-criticality job overruns its optimistic WCET estimate, to put them in a low-priority queue for later execution. To compare mixed-criticality scheduling methods we introduce a formal quality criterion for mixed-criticality scheduling, which, above all else, compares schedulability of high-criticality jobs and only afterwards the schedulability of low-criticality jobs. Based on this criterion we prove that LBP behaves better than the original {\em Bailout Protocol} (BP). We show that LBP can be further improved by slack time exploitation and by gain time collection at runtime, resulting in LBPSG. We also show that these improvements of LBP perform better than the analogous improvements based on BP.Peer reviewedFinal Published versio
- …