1,159 research outputs found

    Concepts and Practices for Transforming Infrastructure from Rigid to Adaptable

    Get PDF
    abstract: Infrastructure are increasingly being recognized as too rigid to quickly adapt to a changing climate and a non-stationary future. This rigidness poses risks to and impacts on infrastructure service delivery and public welfare. Adaptivity in infrastructure is critical for managing uncertainties to continue providing services, yet little is known about how infrastructure can be made more agile and flexible towards improved adaptive capacity. A literature review identified approximately fifty examples of novel infrastructure and technologies which support adaptivity through one or more of ten theoretical competencies of adaptive infrastructure. From these examples emerged several infrastructure forms and possible strategies for adaptivity, including smart technologies, combined centralized/decentralized organizational structures, and renewable electricity generation. With institutional and cultural support, such novel structures and systems have the potential to transform infrastructure provision and management.Dissertation/ThesisMasters Thesis Civil, Environmental and Sustainable Engineering 201

    Water users associations in the NEN region : IFA interventions and overall dynamics

    Get PDF

    USCID water management conference

    Get PDF
    Presented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.Includes bibliographical references.The Surface Energy Balance Algorithm for Land (SEBAL®) is used worldwide to estimate actual evpotranspiration (ET) at different spatial scales (individual fields to entire basins) and temporal scales (water year, growing season, individual day, etc.). SEBAL has been successfully applied on various surface types including crops, riparian, natural vegetation, playas, and wetlands. Comparisons of SEBAL actual ET results with reliable ground based measurements (Eddy covariance, Bowen ratio, lysimeter, water balance and scintillometer) have shown close agreement with differences ranging from 1 to 5% when compared to reliable ground-based estimates over a growing season when the model is applied by experienced operators. This paper describes near real-time application of SEBAL® (Version 2009) to produce weekly maps of actual ET, crop coefficients, and biomass production for California's Central Valley. Each week, the maps for the prior week are produced and posted to the Internet. The maps are developed using MODIS multispectral satellite imagery with an end resolution of 250 meters. This paper discusses potential application of near real time actual ET maps by water managers, water supply agencies and irrigators

    USCID water management conference

    Get PDF
    Presented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.Glenn-Colusa Irrigation District (GCID) is in the process of developing a Resources Plan (Plan) to establish improved policies and decision making processes to better and more actively manage its available water supplies. The first element of the Plan will address Water Supplies and Transfers; it will be developed through evaluation of the district's recent historical and future water demands relative to available surface water and groundwater supplies. The analyses will reveal the probabilities, magnitudes and durations of possible future water supply shortage and surplus conditions. When combined with supporting legal and institutional review, the analyses will provide a basis for managing available water surface and groundwater supplies, shaping conjunctive water management policy, and evaluating potential surface water transfers. GCID is developing a water balance model, including related refinements to the District's water measurement, data management and reporting systems, to analyze historical and possible future water supplies and demands. The water balance will be calculated on a monthly time step for up to ten consecutive years, including winter months when rainfall is appreciable and irrigation demands are generally low. Individual water balances will be prepared for each of GCID's ten water operator areas, which can be combined to form the balance for the overall District. This paper provides a background description of GCID and discusses ongoing development of the water balance model and related improvements to GCID's flow measurement and data management procedures

    USCID water management conference

    Get PDF
    Presented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.Includes bibliographical references.The operation of main irrigation canals is complicated in situations where the operator does not have full control over the canal inflow, or where there are very long transmission distances from the point of supply, or both. Experienced operators are able to control the canal, but often supply errors are simply passed to downstream, thus creating problems further down the system. In previous work, the senior author showed that it is important to contain such errors and not let them pass downstream. With automatic upstream level control, all flow errors are passed to the downstream end of the canal. Distant downstream water level control requires full control of canal inflow. Without this, most errors will occur toward the upstream end of the canal. An alternative scheme is offered here where the canal check gates are controlled based on the relative water level error between adjacent pools. The scheme uses a simple linear model for canal pool response. The scheme is implemented as a multiple-input, multiple-output scheme and solved as a Linear Quadratic Regulator (LQR). Thus all gates respond to relative deviations from water-level set point. The scheme works to keep the relative deviations in all pools the same. If the canal has more inflow than outflow, the scheme will adjust gates so the water levels in all pools will rise together with the same deviation from set point. It thus distributes the error over the entire canal. When in equilibrium, operators will be able to judge the actual flow rate mismatch by the rate of change of these levels. The scheme acts like a combination of upstream level and distant downstream level control. It was tested on a simulation model of the Central Main Canal at the Central Arizona Irrigation and Drainage District, Eloy, AZ

    USCID water management conference

    Get PDF
    Presented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.Includes bibliographical references.The Central Arizona Irrigation and Drainage District (CAIDD) began delivering water to users in 1989. Although designed for automatic control, the system was run manually until a homemade SCADA (Supervisory Control and Data Acquisition) system was developed by district employees. In 2002, problems with radio communication and limitations of the homemade SCADA system prompted CAIDD to begin the process of modernization. New spread-spectrum radios and RTUs (Remote Terminal Units) were purchased along with a commercial SCADA package (iFix by GE-IP). In 2005, CAIDD decided to pursue implementation of full automated control of a majority of district check gates. Currently, 125 gates are under remote manual supervisory control and 129 water levels are remotely monitored. CAIDD chose to implement SacMan (Software for Automated Canal Management) under development by the U.S. Arid Land Agricultural Research Center, Maricopa, AZ. The decision was made to only apply full automation at gates that had gate position sensors. Thus purchase and installation of gate position sensors have slowed implementation. To date, five lateral canals have been set up for full automatic control, where SacMan routes flow changes through the canal and uses downstream water level feedback control to correct for any errors that occur. The ditchrider only makes changes at the farm turnouts and district-operated wells. Automation of the Central Main canal has been tested in simulation. Control of this canal requires special treatment, as described in a companion paper. The district is waiting until enough of the canal is ready for automation before it turns automatic controls on 24/7, since this will require some operator training and remote oversight when problems occur. We hope this occurs in the summer of 2010

    USCID water management conference

    Get PDF
    Presented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.Due to multiple impacts being placed on the James Irrigation District (District) water supply, a study was performed to understand if the District could sustain its current operations. It was determined that the practices could continue but it would require capitally intensive improvements to the Districts infrastructure. Planned improvements include the construction of recharge basins for sustainability, installation of up to 16 groundwater wells and pumps, basin construction, pipeline installation, and construction of flow control and pumping structures. The improvements were estimated to cost approximately 9,000,000;acosttoohighfortheDistricttofundontheirown.Becauseoftheurgencyoftheproject,TheDistrictexploredmultipleopportunitiestofundtheproject.Thisincludedapplyingforloans,applyingforgrants,raisingwaterrates,andraisinglandassessments;allatthesametime.ToobtainloanmoneytheDistrictappliedforfundsthroughProposition82,distributedbytheDepartmentofWaterResources(DWR).Atthissametime,thedistrictpursuedloansthroughlocalbanks,whichprovidedachallengeconsideringtheunstablebankingindustry.Manycomponentsoftheprojectareproposedtobebuiltusinggrantfunding.FirstwasaChallengeGrantasprovidedbyUnitedStatesBureauofReclamation′s(USBR)Water2025program;providing9,000,000; a cost too high for the District to fund on their own. Because of the urgency of the project, The District explored multiple opportunities to fund the project. This included applying for loans, applying for grants, raising water rates, and raising land assessments; all at the same time. To obtain loan money the District applied for funds through Proposition 82, distributed by the Department of Water Resources (DWR). At this same time, the district pursued loans through local banks, which provided a challenge considering the unstable banking industry. Many components of the project are proposed to be built using grant funding. First was a Challenge Grant as provided by United States Bureau of Reclamation's (USBR) Water 2025 program; providing 300,000. Next was the USBR Field Services program; providing 25,000.Approximately25,000. Approximately 50,000 was utilized from the DWR Local Groundwater Assistance Program. In addition to these funds, Recovery Act funding became available for drought relief, where the District could obtain roughly $1,500,000. To generate further income the District approved a water rate increase. It was at this time when it became apparent that the Districts revenue source had become out of balance. The Land assessments were not enough to cover the operational overhead of the District. To rectify this issue, land assessments would need to be raised. This would require a proposition 218 election, which has been pursued. The intention of this paper is to discuss the multiple funding sources available to the District, how they were utilized, and problems that have been encountered

    USCID water management conference

    Get PDF
    Presented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.Includes bibliographical references.Water banks entail the recharge of periodically available excess surface water for storage underground and recovery when needed. Properly formulated, these projects are one of the most cost-effective water supply tools available. These projects are frequently located in rural areas due to availability of land and water. However, projects with capital programs of more than $10 million typically need to be funded with financing. Traditional financing mechanisms such as raising customer fees, bonding and state/federal grants are increasingly difficult to obtain. Therefore, many rural agencies pursue partnerships with urban water utilities that typically have more available capital. This approach, pioneered by Semitropic Water Storage District and Arvin-Edison Water Storage District in the 1990s, entails upfront payments (and annual operating fees) by the utilities in exchange for long-term leases of project capacity. The decision to use this funding approach must be made early in the project formulation because it requires that the project be sized and configured to meet both local and utility partner needs. Water utilities are only willing to enter into these partnerships if the project can increase their water supply reliability at a lower cost than other alternatives and only if three critical criteria have been met: 1) Lack of controversy as evidenced by tangible benefits to, oversight from and support by local stakeholders; 2) proven technical, regulatory and economic viability; and 3) operational flexibility and modularity, enabling construction in phases. A project should not be marketed before each element is in place. These requirements typically take several years and several million dollars to achieve

    Ground water and surface water under stress

    Get PDF
    Presented at Ground water and surface water under stress: competition, interaction, solutions: a USCID water management conference on October 25-28, 2006 in Boise, Idaho.Includes bibliographical references.The A&B Irrigation District in south-central Idaho supplies water to irrigate over 76,000 acres. The district's 14,660-acre Unit A is supplied with water from the Snake River. Unit B is comprised of 62,140 acres of land irrigated by pumping groundwater from the Eastern Snake Plain Aquifer (ESPA) using 177 deep wells. Pumping depths range from 200 to 350 feet. Water from Unit B wells is distributed to irrigated lands via a system of short, unlined lateral canals averaging about 3/4-mile in length with capacities of 2 to 12 cfs. During the period from 1975 to 2005, the average level of the ESPA under the A&B Irrigation District dropped 25 ft and as much as 40 ft in some locations. This has forced the district to deepen some existing wells and drill several new wells. To help mitigate the declining aquifer, the district and its farmers have implemented a variety of irrigation system and management improvements. Improvements have involved a concerted effort by the district, landowners, and local and federal resource agencies. The district has installed variable speed drives on some supply wells, installed a SCADA system to remotely monitor and control well pumps, and piped portions of the open distribution laterals. This has permitted farmers to connect farm pressure pumps directly to supply well outlets. Farmers have helped by converting many of their surface irrigation application systems to sprinklers, moving farm deliveries to central locations to reduce conveyance losses, and installing systems to reclaim irrigation spills and return flows
    • …
    corecore