Experimental Analysis of Algorithms for Coflow Scheduling
Modern data centers face new scheduling challenges in optimizing job-level
performance objectives, where a significant challenge is the scheduling of
highly parallel data flows with a common performance goal (e.g., the shuffle
operations in MapReduce applications). Chowdhury and Stoica introduced the
coflow abstraction to capture these parallel communication patterns, and
Chowdhury et al. proposed effective heuristics to schedule coflows efficiently.
In our previous paper, we considered the strongly NP-hard problem of minimizing
the total weighted completion time of coflows with release dates, and developed
the first polynomial-time scheduling algorithms with O(1)-approximation ratios.
In this paper, we carry out a comprehensive experimental analysis on a
Facebook trace and extensive simulated instances to evaluate the practical
performance of several algorithms for coflow scheduling, including the
approximation algorithms developed in our previous paper. Our experiments
suggest that simple algorithms provide effective approximations of the optimal,
and that the performance of our approximation algorithms is relatively robust,
near optimal, and always among the best compared with the other algorithms, in
both the offline and online settings.Comment: 29 pages, 8 figures, 11 table
Scheduling MapReduce Jobs under Multi-Round Precedences
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks
in the practical scenario where each job requires several map-reduce rounds. We
seek to minimize the average weighted completion time and consider scheduling
on identical and unrelated parallel processors. For identical processors, we
present LP-based O(1)-approximation algorithms. For unrelated processors, the
approximation ratio naturally depends on the maximum number of rounds of any
job. Since the number of rounds per job in typical MapReduce algorithms is a
small constant, our scheduling algorithms achieve a small approximation ratio
in practice. For the single-round case, we substantially improve on previously
best known approximation guarantees for both identical and unrelated
processors. Moreover, we conduct an experimental analysis and compare the
performance of our algorithms against a fast heuristic and a lower bound on the
optimal solution, thus demonstrating their promising practical performance
Single-machine scheduling with stepwise tardiness costs and release times
We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems
Asymptotically Optimal Approximation Algorithms for Coflow Scheduling
Many modern datacenter applications involve large-scale computations composed
of multiple data flows that need to be completed over a shared set of
distributed resources. Such a computation completes when all of its flows
complete. A useful abstraction for modeling such scenarios is a {\em coflow},
which is a collection of flows (e.g., tasks, packets, data transmissions) that
all share the same performance goal.
In this paper, we present the first approximation algorithms for scheduling
coflows over general network topologies with the objective of minimizing total
weighted completion time. We consider two different models for coflows based on
the nature of individual flows: circuits, and packets. We design
constant-factor polynomial-time approximation algorithms for scheduling
packet-based coflows with or without given flow paths, and circuit-based
coflows with given flow paths. Furthermore, we give an -approximation polynomial time algorithm for scheduling circuit-based
coflows where flow paths are not given (here is the number of network
edges).
We obtain our results by developing a general framework for coflow schedules,
based on interval-indexed linear programs, which may extend to other coflow
models and objective functions and may also yield improved approximation bounds
for specific network scenarios. We also present an experimental evaluation of
our approach for circuit-based coflows that show a performance improvement of
at least 22% on average over competing heuristics.Comment: Fixed minor typo
Models and Strategies for Variants of the Job Shop Scheduling Problem
Recently, a variety of constraint programming and Boolean satisfiability
approaches to scheduling problems have been introduced. They have in common the
use of relatively simple propagation mechanisms and an adaptive way to focus on
the most constrained part of the problem. In some cases, these methods compare
favorably to more classical constraint programming methods relying on
propagation algorithms for global unary or cumulative resource constraints and
dedicated search heuristics. In particular, we described an approach that
combines restarting, with a generic adaptive heuristic and solution guided
branching on a simple model based on a decomposition of disjunctive
constraints. In this paper, we introduce an adaptation of this technique for an
important subclass of job shop scheduling problems (JSPs), where the objective
function involves minimization of earliness/tardiness costs. We further show
that our technique can be improved by adding domain specific information for
one variant of the JSP (involving time lag constraints). In particular we
introduce a dedicated greedy heuristic, and an improved model for the case
where the maximal time lag is 0 (also referred to as no-wait JSPs).Comment: Principles and Practice of Constraint Programming - CP 2011, Perugia