830 research outputs found
Single-machine scheduling with stepwise tardiness costs and release times
We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems
An Exact Approach to Early/Tardy Scheduling with Release Dates
In this paper we consider the single machine earliness/tardiness scheduling problem with di?erent release dates and no unforced idle time. The problem is decomposed into a weighted earliness subproblem and a weighted tardiness subproblem. Lower bounding procedures are proposed for each of these subproblems, and the lower bound for the original problem is then simply the sum of the lower bounds for the two subproblems. The lower bounds and several versions of a branch-and-bound algorithm are then tested on a set of randomly generated problems, and instances with up to 30 jobs are solved to optimality. To the best of our knowledge, this is the first exact approach for the early/tardy scheduling problem with release dates and no unforced idle time.scheduling, early/tardy, release dates, lower bounds, branch-and-bound
Heuristics for the Early/Tardy Scheduling Problem with Release Dates
In this paper we consider the single machine earliness/tardiness scheduling problem with di?erent release dates and no unforced idle time. We analyse the performance of several dispatch rules, a greedy procedure and a decision theory local search heuristic. The dispatch rules use a lookahead parameter whose value must be specified. We perform some experiments to determine an appropriate value for this parameter. The use of dominance rules to improve the solutions obtained by these heuristics is also considered. The computational results show that the use of the dominance rules can indeed improve the solution quality with little additional computational e?ort. To the best of our knowledge, this is the first analysis of heuristic performance for the early/tardy scheduling problem with release dates and no unforced idle time.scheduling, early/tardy, release dates, heuristics
Beam search heuristics for quadratic earliness and tardiness scheduling
In this paper, we present beam search heuristics for the single machine scheduling problem with quadratic earliness and tardiness costs, and no machine idle time. These heuristics include classic beam search procedures, as well as filtered and recovering algorithms. We consider three dispatching heuristics as evaluation functions, in order to analyse the effect of different rules on the performance of the beam search procedures. The computational results show that using better dispatching heuristics improves the effectiveness of the beam search algorithms. The performance of the several heuristics is similar for instances with low variability. For high variability instances, however, the detailed, filtered and recovering beam search procedures clearly outperform the best existing heuristic. The detailed beam search algorithm performs quite well, and is recommended for small to medium size instances. For larger instances, however, this procedure requires excessive computation times, and the recovering beam search algorithm then becomes the heuristic of choice.scheduling, heuristics, beam search, single machine, quadratic earliness, quadratic tardiness
Bütünleşik tedarik zinciri çizelgeleme modelleri: Bir literatür taraması
Research on integration of supply chain and scheduling is relatively recent, and
number of studies on this topic is increasing. This study provides a comprehensive
literature survey about Integrated Supply Chain Scheduling (ISCS) models to help
identify deficiencies in this area. For this purpose, it is thought that this study will
contribute in terms of guiding researchers working in this field. In this study,
existing literature on ISCS problems are reviewed and summarized by introducing
the new classification scheme. The studies were categorized by considering the
features such as the number of customers (single or multiple), product lifespan
(limited or unlimited), order sizes (equal or general), vehicle characteristics
(limited/sufficient and homogeneous/heterogeneous), machine configurations and
number of objective function (single or multi objective). In addition, properties of
mathematical models applied for problems and solution approaches are also
discussed.Bütünleşik Tedarik Zinciri Çizelgeleme (BTZÇ) üzerine yapılan araştırmalar
nispeten yenidir ve bu konu üzerine yapılan çalışma sayısı artmaktadır. Bu çalışma,
bu alandaki eksiklikleri tespit etmeye yardımcı olmak için BTZÇ modelleri hakkında
kapsamlı bir literatür araştırması sunmaktadır. Bu amaçla, bu çalışmanın bu alanda
çalışan araştırmacılara rehberlik etmesi açısından katkı sağlayacağı
düşünülmektedir. Bu çalışmada, BTZÇ problemleri üzerine mevcut literatür gözden
geçirilmiş ve yeni sınıflandırma şeması tanıtılarak çalışmalar özetlenmiştir.
Çalışmalar; tek veya çoklu müşteri sayısı, sipariş büyüklüğü tipi (eşit veya genel),
ürün ömrü (sınırlı veya sınırsız), araç karakteristikleri (sınırlı/yeterli ve
homojen/heterojen), makine konfigürasyonları ve amaç fonksiyonu sayısı (tek veya
çok amaçlı) gibi özellikler dikkate alınarak kategorize edildi. Ayrıca problemler için
uygulanan matematiksel modellerin özellikleri ve çözüm yaklaşımları da
tartışılmıştır
Improved Lower Bounds for the Early/Tardy Scheduling Problem with No Idle Time
In this paper we consider the single machine earliness/tardiness scheduling problem with no idle time. Two of the lower bounds previously developed for this problem are based on lagrangean relaxation and the multiplier adjustment method, and require an initial sequence. We investigate the sensitivity of the lower bounds to the initial sequence, and experiment with di?erent dispatch rules and some dominance conditions. The computational results show that it is possible to obtain improved lower bounds by using a better initial sequence. The lower bounds are also incorporated in a branch-and-bound algorithm, and the computational tests show that one of the new lower bounds has the best performance for larger instances.scheduling, early/tardy, lower bound
Flowshop scheduling problems with due date related objectives: A review of the literature
3rd International Conference on Industrial Engineering and Industrial Management
XIII Congreso de Ingeniería de Organización
Barcelona-Terrassa, September 2nd-4th 200
Greedy randomized dispatching heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties
In this paper, we present greedy randomized dispatching heuristics for the single machine scheduling problem with quadratic earliness and tardiness costs, and no machine idle time. The several heuristic versions differ, on the one hand, on the strategies involved in the construction of the greedy randomized schedules. On the other hand, these versions also differ on whether they employ only a final improvement step, or perform a local search after each greedy randomized construction. The proposed heuristics were compared with existing procedures, as well as with optimum solutions for some instance sizes. The computational results show that the proposed procedures clearly outperform their underlying dispatching heuristic, and the best of these procedures provide results that are quite close to the optimum. The best of the proposed algorithms is the new recommended heuristic for large instances, as well as a suitable alternative to the best existing procedure for the larger of the middle size instances.scheduling, single machine, early/tardy, quadratic penalties, greedy randomized dispatching rules
- …