15,062 research outputs found
Optimized Time Management for Declarative Workflows
Declarative process models are increasingly used since they fit better
with the nature of flexible process-aware information systems and the requirements
of the stakeholders involved. When managing business processes, in addition,
support for representing time and reasoning about it becomes crucial. Given
a declarative process model, users may choose among different ways to execute
it, i.e., there exist numerous possible enactment plans, each one presenting specific
values for the given objective functions (e.g., overall completion time). This
paper suggests a method for generating optimized enactment plans (e.g., plans
minimizing overall completion time) from declarative process models with explicit
temporal constraints. The latter covers a number of well-known workflow
time patterns. The generated plans can be used for different purposes like providing
personal schedules to users, facilitating early detection of critical situations,
or predicting execution times for process activities. The proposed approach is
applied to a range of test models of varying complexity. Although the optimization
of process execution is a highly constrained problem, results indicate that
our approach produces a satisfactory number of suitable solutions, i.e., solutions
optimal in many cases
A System for Deduction-based Formal Verification of Workflow-oriented Software Models
The work concerns formal verification of workflow-oriented software models
using deductive approach. The formal correctness of a model's behaviour is
considered. Manually building logical specifications, which are considered as a
set of temporal logic formulas, seems to be the significant obstacle for an
inexperienced user when applying the deductive approach. A system, and its
architecture, for the deduction-based verification of workflow-oriented models
is proposed. The process of inference is based on the semantic tableaux method
which has some advantages when compared to traditional deduction strategies.
The algorithm for an automatic generation of logical specifications is
proposed. The generation procedure is based on the predefined workflow patterns
for BPMN, which is a standard and dominant notation for the modeling of
business processes. The main idea for the approach is to consider patterns,
defined in terms of temporal logic,as a kind of (logical) primitives which
enable the transformation of models to temporal logic formulas constituting a
logical specification. Automation of the generation process is crucial for
bridging the gap between intuitiveness of the deductive reasoning and the
difficulty of its practical application in the case when logical specifications
are built manually. This approach has gone some way towards supporting,
hopefully enhancing our understanding of, the deduction-based formal
verification of workflow-oriented models.Comment: International Journal of Applied Mathematics and Computer Scienc
Integration of BPM systems
New technologies have emerged to support the global economy where for instance suppliers, manufactures and retailers are working together in order to minimise the cost and
maximise efficiency. One of the technologies that has become a buzz word for many businesses is business process management or BPM. A business process comprises activities
and tasks, the resources required to perform each task, and the business rules linking these activities and tasks. The tasks may be performed by human and/or machine actors.
Workflow provides a way of describing the order of execution and the dependent relationships between the constituting activities of short or long running processes.
Workflow allows businesses to capture not only the information but also the processes that transform the information - the process asset (Koulopoulos, T. M., 1995). Applications which involve automated, human-centric and collaborative processes across organisations are
inherently different from one organisation to another. Even within the same organisation but over time, applications are adapted as ongoing change to the business processes is seen as the norm in today’s dynamic business environment. The major difference lies in the specifics of business processes which are changing rapidly in order to match the way in which businesses operate. In this chapter we introduce and discuss Business Process Management (BPM) with a focus on the integration of heterogeneous BPM systems across multiple organisations. We identify the problems and the main challenges not only with regards to technologies but also in the social and cultural context. We also discuss the issues that have arisen in our bid to find the solutions
Educational process modelling with workflow and time Petri nets : a thesis presented in partial fulfilment of the requirements for the degree of Master of Science in Computer Science at Massey University, Palmerston North, New Zealand
The research presented in this thesis describes how to use workflow management technology to model educational processes with a time axis. As workflow management technology has been widely used in modelling business processes, it has the potential to model educational processes. Based upon the components of workflow, educational processes and business processes have many common features such that educational processes can be modelled with workflow management technology. In addition, owing to the importance of the time component in processes, time Petri nets have been chosen as the design language for the modelling of the educational processes. The notation of time Petri nets has been illustrated in this thesis for the educational process. In this thesis, three different educational processes have been presented and modelled with workflow management technology as well as with time Petri nets individually. Furthermore, the architecture of the educational process management system has been constructed by adopting the reference model from the Workflow Management Coalition. To show the validity of using workflow management technology in the education domain, a sub-process of an educational process has been modelled and developed with certain developing techniques. It provides the potential research direction for further research on the modelling of educational process with workflow technology associated with a time component
An LTL Semantics of Business Workflows with Recovery
We describe a business workflow case study with abnormal behavior management
(i.e. recovery) and demonstrate how temporal logics and model checking can
provide a methodology to iteratively revise the design and obtain a correct-by
construction system. To do so we define a formal semantics by giving a
compilation of generic workflow patterns into LTL and we use the bound model
checker Zot to prove specific properties and requirements validity. The working
assumption is that such a lightweight approach would easily fit into processes
that are already in place without the need for a radical change of procedures,
tools and people's attitudes. The complexity of formalisms and invasiveness of
methods have been demonstrated to be one of the major drawback and obstacle for
deployment of formal engineering techniques into mundane projects
Planning and Scheduling of Business Processes in Run-Time: A Repair Planning Example
Over the last decade, the efficient and flexible management of business
processes has become one of the most critical success aspects. Furthermore, there
exists a growing interest in the application of Artificial Intelligence Planning and
Scheduling techniques to automate the production and execution of models of organization.
However, from our point of view, several connections between both
disciplines remains to be exploited. The current work presents a proposal for modelling
and enacting business processes that involve the selection and order of the
activities to be executed (planning), besides the resource allocation (scheduling),
considering the optimization of several functions and the reach of some objectives.
The main novelty is that all decisions (even the activities selection) are taken in
run-time considering the actual parameters of the execution, so the business process
is managed in an efficient and flexible way. As an example, a complex and representative
problem, the repair planning problem, is managed through the proposed
approach.Ministerio de Ciencia e Innovación TIN2009-13714Junta de Andalucía P08-TIC-0409
A core ontology for business process analysis
Business Process Management (BPM) aims at supporting the whole life-cycle necessary to deploy and maintain business processes in organisations. An important step of the BPM life-cycle is the analysis of the processes deployed in companies. However, the degree of automation currently achieved cannot support the level of adaptation required by businesses. Initial steps have been performed towards including some sort of automated reasoning within Business Process Analysis (BPA) but this is typically limited to using taxonomies. We present a core ontology aimed at enhancing the state of the art in BPA. The ontology builds upon a Time Ontology and is structured around the process, resource, and object perspectives as typically adopted when analysing business processes. The ontology has been extended and validated by means of an Events Ontology and an Events Analysis Ontology aimed at capturing the audit trails generated by Process-Aware Information Systems and deriving additional knowledge
- …