2 research outputs found
Automating the assessment of biofouling in images using expert agreement as a gold standard
Biofouling is the accumulation of organisms on surfaces immersed in water. It
is of particular concern to the international shipping industry because it
increases fuel costs and presents a biosecurity risk by providing a pathway for
non-indigenous marine species to establish in new areas. There is growing
interest within jurisdictions to strengthen biofouling risk-management
regulations, but it is expensive to conduct in-water inspections and assess the
collected data to determine the biofouling state of vessel hulls. Machine
learning is well suited to tackle the latter challenge, and here we apply deep
learning to automate the classification of images from in-water inspections to
identify the presence and severity of fouling. We combined several datasets to
obtain over 10,000 images collected from in-water surveys which were annotated
by a group biofouling experts. We compared the annotations from three experts
on a 120-sample subset of these images, and found that they showed 89%
agreement (95% CI: 87-92%). Subsequent labelling of the whole dataset by one of
these experts achieved similar levels of agreement with this group of experts,
which we defined as performing at most 5% worse (p=0.009-0.054). Using these
expert labels, we were able to train a deep learning model that also agreed
similarly with the group of experts (p=0.001-0.014), demonstrating that
automated analysis of biofouling in images is feasible and effective using this
method.Comment: 12 page
Off-the-rack instead of tailor-made module-based plant design at equipment level
Module-based plant design facilitates a paradigm shift in chemical and biochemical industry
to decrease the time needed for plant design. Instead of a tailored design of apparatuses for
a target production rate, modules are selected off-the-rack to set up a production plant.
Within the scope of this thesis, four important areas of module-based plant design at
equipment level are investigated. First, the determination of a plants’ overall operating
window, a prerequisite for equipment module selection and evaluation is improved by
considering the so far neglected non-linear dependency between the operating constraints
and the production rate of a plant.
Second, the currently accepted view that investment costs are determining the decision on
the use of equipment modules for different process units is disproved and novel preselection
approaches are proposed, applied and evaluated. A preselection approach based on
investment and operating costs is rated most suitable to decide on the use of equipment
modules for a case study. The third area explored is equipment module selection for a
constant market demand, aiming at flexibility in production rate at low investment costs, as
well as for a market demand development. It is shown by case studies that modular
production plants offer a promising alternative to conventionally designed plants. Finally, an
approach to design equipment modules for flexibility in production rate is introduced and
applied. For the case study of a heat exchanger it is shown that a four times larger operating
window can be obtained at only 14 % higher total annual costs compared to a conventionally
designed heat exchanger.
Hence, this work investigates four key areas in module-based plant design at equipment
level beyond current state of the art contributing to a paradigm shift in plant design.Modulbasierte Anlagenplanung ermöglicht einen Paradigmenwechsel in der chemischen
und biochemischen Industrie, um die Zeit der Anlagenplanung zu verkürzen. Anstelle einer
maßgeschneiderten Auslegung von Apparaten für einen Auslegungspunkt werden Module
von der Stange ausgewählt, um eine Produktionsanlage zu errichten.
Im Rahmen dieser Arbeit werden vier wichtige Bereiche der modulbasierten Anlagenplanung
auf Equipmentebene untersucht. Erstens wird die Bestimmung des Gesamtbetriebsfensters
einer Anlage, eine Voraussetzung für die Auswahl von Equipmentmodulen und Bewertung
von modularen Anlagen, durch die Berücksichtigung der bisher vernachlässigten und
nichtlinearen Abhängigkeit zwischen den Betriebsgrenzen und der Produktionsrate einer
Anlage verbessert. Zweitens werden aktuelle Entscheidungskriterien für den Einsatz von
Equipmentmodulen für verschiedene Prozesseinheiten in Frage gestellt und neue
Vorauswahlmethoden vorgeschlagen, angewendet und bewertet. Dabei wird die derzeit
akzeptierte Ansicht, dass Investitionskosten bestimmend sind, widerlegt. Eine
Vorauswahlmethode, um über die Verwendung von Equipmentmodulen zu entscheiden, die
auf Investitions- und Betriebskosten basiert, wird für eine Fallstudie als am geeignetsten
bewertet. Der dritte untersuchte Bereich behandelt die Auswahl von Equipmentmodulen für
eine konstante Marktnachfrage, mit dem Ziel einer hohen Flexibilität in der Produktionsrate
bei niedrigen Investitionskosten, sowie für eine Marktnachfrageentwicklung. Anhand von
Fallstudien wird gezeigt, dass modulare Produktionsanlagen eine vielversprechende
Alternative zu konventionell ausgelegten Anlagen darstellen. Abschließend wird ein Ansatz
zur Auslegung von Equipmentmodulen für eine hohe Flexibilität in der Produktionsrate
vorgestellt und angewendet. Am Beispiel eines Wärmeübertragers wird gezeigt, dass ein
viermal größeres Betriebsfenster für nur 14 % höhere jährliche Gesamtkosten im Vergleich
zu einem konventionell ausgelegten Wärmeübertrager erreicht werden kann.
Somit untersucht diese Arbeit vier wichtige Bereiche der modulbasierten Anlagenplanung
auf Equipmentebene über den aktuellen Stand der Technik hinaus und liefert ihren Beitrag
für einen Paradigmenwechsel in der Anlagenplanung