Cover

Abstract

Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary CompressionCase Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550 Muhammad Rizal Permadi, Indrasurya B. Mochtar, Noor Endah Mochtar & Reza KazhimiThe Effect of Prefabricated Vertical Drain Length on Soft Soil Settlement (Case Study: The North Ring Road of Lamongan STA. 3+200)Henniko Okadha, Herman Wahyudi, Yudhi Lastiasih & Sifa' UdukhaAnalysis of Excavated Soil Utilization as Embankment Material and Foundation Layer on Singaraja – Mengwitani Road Section (BALI) Dinul Hadi, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya & Noor FachrieAnalysis of PVD Installation Methods Due to Limited Vertical Clearance in the Lamongan North Ring Road Construction Project Section 1 STA 0+400 to STA 0+426 Fanny Rumintha Br Barimbing, Yudhi Lastiasih, Herman Wahyudi & Sifa` UdukhaDetermination of Building Assets and Equipment Requirements Based on Sustainable Warehouse Cencepts for PT Kansai Prakarsa Coatings Putri Dewi Purnama & Halla Nur Aziza

Similar works

Full text

thumbnail-image

Center for Scientific Publication

redirect
Last time updated on 26/07/2025

This paper was published in Center for Scientific Publication.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.