A simulation of a photovoltaic system connected to the grid, located in El Limón, in the Portoviejo canton, for self-consumption was carried out to reduce demand during daytime hours. The literature review was used and the PvSyst tool was used, a system with a total capacity of 3075 Wp was evaluated. Various parameters were analyzed, including energy production, system losses, and economic viability. The results indicate an annual production of 4278.52 kWh and a payback period of approximately 3 years, with an average performance of 84.10%. This study provides a detailed view of the performance and financial implications of the implementation of photovoltaic systems in this region
Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.