Bandung Polytechnic of Manufacturing is an institution in the government environment in the form of BLU. The realization of the targeted from the Ministry of Finance to POLMAN hasn’t been realized 100%. The low realization of cooperation compared to SPP indicates a special cause of low cooperation performance. Observations on the DIES NTC project began with an exploration of the business issue by interviews with POLMAN productions, Cause Effect Diagram, and measuring the timeliness of the project condition of the project using the Critical Path Method. After that, the audit checklist form design refers to 10 knowledge areas and ISO 9001-2015. The Checklist form then filled by three experts from POLMAN production. Based on the audit checklist form on the NTC project, 12 gaps were obtained. From the analysis found the root of the problem regarding the supervision of the project is not good. Improvement is required by forming a special team to conduct an Internal Audit at the scale of each project. Supervision and control on a smaller scale can ensure the project runs well so that the findings on the project can be revised immediately. Keywords: NTC Dies Project, Form Checklist, 10 Knowledge Area, ISO 9001-2015, Internal Audi
Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.