RANCANGAN PUSH BACK 3 BULAN DI FRONT SUWOTA SITE TANJUNGBULI PT ANEKA TAMBANG UBP NIKEL MALUKU UTARA KABUPATEN HALMAHERA TIMUR PROVINSI MALUKU UTARA

Abstract

A mine planning design for mining in Tanjungbuli is a long term design, so it is necessary to simplify the entire volume in the overall pit into pit mining units are smaller, so making it easier to handle. Therefore, it is necessary to design a push back for the next 3 months with reference to the principle of conservation of mineral and utilization of minerals to be effectively and efficiently, and look at the deficiencies previously. This can be achieved if the preparation of the plans in accordance with the rules of good mining pratice. Keywords : push back, good mining pratic

Similar works

Full text

thumbnail-image

UPN (Universitas Pembangunan Nasional) Veteran Yogyakarta: Institutional Repository

redirect
Last time updated on 17/10/2019

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.