Location of Repository

Bridge over a local road and a brook

By Andrea Tichavská

Abstract

The purpose of the master thesis is the design of the concrete highway bridge by European standards. The highway is situated on two independent prestressed load-bearing structures with cross-section area of constant dimensions over its length. The bridge deck is built on a falsework considering its proportions and obstacles under the bridge. The thesis contains the design and the assessment of the load-bearing structure in longitudinal and transverse direction including the calculation of cross beams and an anchorage zone

Topics: concrete bridge; dvojtrámový most; dálnice; předpjatý beton; motorway; falsework; pevná skruž; betonový most; prestressed concrete; double-girder bridge
Publisher: Vysoké učení technické v Brně. Fakulta stavební
Year: 2015
OAI identifier: oai:invenio.nusl.cz:227316
Download PDF:
Sorry, we are unable to provide the full text but you may find it at the following location(s):
  • http://www.nusl.cz/ntk/nusl-22... (external link)
  • Suggested articles


    To submit an update or takedown request for this paper, please submit an Update/Correction/Removal Request.