The Block of Flats in Brno, Bystrc - Project Planning and Management
Abstract
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats- info:eu-repo/semantics/masterThesis
- project planning; technická zpráva; cost; časový a finanční plán; tower crane; situace stavby; flat roof; realizace; brick systém; permanent formwork; realization; plochá střecha; stavební objekt; náklady; The block of flats; Bytový dům; construction machinery; hlavní technologické etapy; věžový jeřáb; the construction site equipment; technologický předpis; the main technological steps; technological prescription; technical report; příprava; beton; the construction situation; building structure; ztracené bednění; zděný systém; concrete; zařízení staveniště; time schedule and financial plan; stavební stroje