Set of residential buildings in SM6, Staré Město - Project planning implementation of construction
Abstract
The master thesis with the name Set of residential buildings in SM6, Staré Město - Project planning implementation of construction solves preparation and realization of building. The aim of master thesis is to design of time, financial, material and human resources. The thesis contains calculation, time schedule, building-site, technologicals standards, controls and trials plans, design of mechanism, study of realization of the main stages. The thesis is prepared on the basis of project documents provided by the investor with the approval of the design office- info:eu-repo/semantics/masterThesis
- studie hlavních technologických etap; technical report.; time schedule; Residential building; rozpočet; new building; building-site; calculation; technická zpráva.; mechanism; kontrolní a zkušební plán; control and trial plan; zařízení staveniště; novostavba; časový plán; Bytový dům; technologický předpis; mechanismus; study of realization of the main stages; technological standard