Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Sokolnice 110kV switching station, during the period of 2011

Abstract

While changing the connection of the power transformators we have to find out if the powered distribution network can accept this change and if it will fulfil the set conditions. Important is to keep the range of permitted voltage on separate distribution points of this network and to find out proportions on separate circuits. This is connected with a circuit load which cannot exceed its limit (transmission capacity). The network is checked against outages of separate circuits (N-1) and we try to find out if other circuits are not overloaded during the transmission of the outaged circuit’s power. We can also suggest various other possible outages. It is also important to find out whether separate distribution points agree with their short-circuit capabilities. Overall we investigate advantages of this circuit. The theoretical part describes the means of calculation of the network functioning and short-circuit conditions. All the calculated results (dispatcher control system Sinaut Spectrum) for the given circuits of power transformators are processed and evaluated in the practical part of the thesis

Similar works

Full text

thumbnail-image

National Repository of Grey Literature

redirect
Last time updated on 10/08/2016

This paper was published in National Repository of Grey Literature.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.