Immediate loading of 2 (all-on-2) versus 4 (all-on-4) implants placed with a flapless technique supporting mandibular cross-arch fixed prostheses: preliminary results from a pilot randomised controlled trial.

Abstract

PURPOSE: To evaluate the clinical outcome of 2 implants versus 4 implants placed flapless in fully edentulous mandibles and immediately restored with metal-resin screw-retained cross-arch prostheses. MATERIALS AND METHODS: Sixty patients from two different centres were randomised: 30 to the allon- 2 group and 30 to the all-on-4 group. To be immediately loaded, implants had to be inserted with a minimum torque of 40 Ncm. Outcome measures were prosthesis and implant failures, and biological and biomechanical complications. RESULTS: Flaps were raised in 18 patients. Two implants in 2 patients did not reach the planned insertion torque and were immediately replaced by larger diameter ones. Four months after loading, no drop-out or implant failure occurred. One biomechanical complication occurred in the all-on-2 group versus 4 in the all-on-4 group. There were no statistically significant differences between groups for complications. There were no differences between centres. CONCLUSIONS: These very preliminary results, just 4 months after loading, suggest that immediately loaded mandibular cross-arch fixed dental prostheses can be supported by only 2 dental implants. Longer follow-ups (around 10 years) are needed to understand whether cross-arch mandibular prostheses can be successfully supported by only 2 dental implants

Similar works

Full text

thumbnail-image

Archivio istituzionale della ricerca - Alma Mater Studiorum Università di Bologna

redirect
Last time updated on 03/09/2019

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.