A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest

Abstract

Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, table 6TABLE 6 COST COMPARISON OF THE SNAKE-COLORADO PROJECT AND THE PACIFIC SOUTHWEST WATER PLAN PACIFIC SOUTHWEST WATER PLAN SNAKE-COLORADO PROJECT SAVINGS CONSTRUCTION COST MillionConstruction2045.21292.5InterestDuringConstruction174.8104.9TotalMillion Construction 2045.2 1292.5 Interest During Construction 174.8 104.9 Total 2220.0 1397.4 1397.4 822.6 ANNUAL COST MillionPerYearCapital70.344.2Operation,Maintenance,Replacement,PowerandPowerRevenues34.432,2βˆ—Total Million Per Year Capital 70.3 44.2 Operation, Maintenance, Replacement, Power and Power Revenues 34.4 32,2* Total 104.7 76.476.4 28.3 PerAcreβˆ’FootAverageunitcosttodeliver1.2millionacreβˆ’feettoSouthernCaliforniaand1.2millionacreβˆ’feettoLakeHavasu.Per Acre-Foot Average unit cost to deliver 1.2 million acre-feet to Southern California and 1.2 million acre-feet to Lake Havasu. 43.60 31.8031.80 11.80 * Includes 14.6millionperyearforSnakeandColumbiaRiverPowerReparationsand14.6 million per year for Snake and Columbia River Power Reparations and 9.2 million per year for operation, maintenance, replacements and power for MWD Colorado River Aqueduct. TABLE 6Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,233,466 byte

    Similar works