A Plan to Transport Surplus Columbia River Basin Water to the Arid Pacific Northwest
- Publication date
- Publisher
Abstract
Document: "Snake-Colorado Project, A Plan to Transport Surplus Columbia River Basin Water to the Arid Southwest", October, 1963, table 6TABLE 6
COST COMPARISON OF THE SNAKE-COLORADO PROJECT
AND THE PACIFIC SOUTHWEST WATER PLAN
PACIFIC SOUTHWEST WATER PLAN SNAKE-COLORADO PROJECT SAVINGS
CONSTRUCTION COST MillionConstruction2045.21292.5InterestDuringConstruction174.8104.9Total 2220.0 1397.4 822.6
ANNUAL COST MillionPerYearCapital70.344.2Operation,Maintenance,Replacement,PowerandPowerRevenues34.432,2βTotal104.7 76.428.3
PerAcreβFootAverageunitcosttodeliver1.2millionacreβfeettoSouthernCaliforniaand1.2millionacreβfeettoLakeHavasu.43.60 31.8011.80
* Includes 14.6millionperyearforSnakeandColumbiaRiverPowerReparationsand9.2 million per year for operation, maintenance, replacements and power for MWD Colorado River Aqueduct.
TABLE 6Epson Perfection 4870 Photo, 400 dpi, 8 bit, 1,233,466 byte