Bent crystal was extracting 70-GeV protons with average intensity 4*10^11 (as
measured in external beamline) per spill of 1.6 s duration, in parallel to the
simultaneous work of two internal targets in the accelerator ring. An
additional crystal, placed in the external beamline, was deflecting a small
part of the extracted beam with intensity 10^7 protons toward another physics
experiment. Crystal-extracted beam had a typical size of 4 mm by 4 mm fwhm at
the end of the external beamline. Measurements for the extraction efficiency
and other characteristics at the simultaneous work of four experimental set-ups
are presented. With crystal working in the above-said regime during one month,
no degradation of channeling was observed. The studies of extraction efficiency
have been continued with new crystals.Comment: 6pp. Presented at EPAC 200