We consider the problem of minimizing the makespan in a flowshop involving
maximal and minimal time lags. Time lag constraints generalize the classical
precedence constraints between operations. We assume that such constraints are
only defined between operations of the same job. We propose a solution method
and present several extensions.Comment: 2 pages. Also available at http://hal.inria.fr/inria-0000014