2002 Molise earthquake: the run of the reconstruction

Abstract

The job illustrates the activities, the normative and procedural dispositions of the reconstruction in Molise that has been on its way after the 2002 earthquake. The individualized run has been characterized by numerous technical innovations, consequent to the emanation of the new seismic code (OPCM n. 3274/2003). The President of the Region, Delegated Commissioner for the reconstruction after-earthquake 2002, has programmed and coordinated all the activities, using structures of consultation, of address and of technical support. Particularly, the Scientific Technical Committee (CTS) has taken care of the containing directives, the criterions and the general norms for the trial of the reconstruction, emanate through the Ordinance of the Delegated Commissioner n. 13/2003. The Committee for the Microzonation (CMS) has predisposed indications and guidelines, while the CNR Institute for the Technologies of the Construction, in collaboration with the University of Basilicata and Dicat-University of Genoa, has up the guidelines for the investigations of vulnerability and for the interventions on the scholastic buildings, on the churches and on the monumental buildings. Finally, the Delegated Commissioner has ordered that the Local Corporate Bodies were made themselves responsible for the reconstruction realization. In the Campobasso province , with exception of the S.Giuliano diPuglia common, have been compiled about 16.200 preliminary projects (PPS). It is esteemed a general economic requirement of about 1.800 million of Euros for the residential buildings and of about 900 million of Euros for the public works. The reconstruction is in advanced realization and involves the buildings affected by an evacuation measure (Priority A).PublishedPisa, Italia4.2. Scenari e mappe di pericolosità sismica e dannoope

    Similar works