Effective Utilization of Fly Ash, Iron Ore Slime and LD-Slag in Geopolymer Mortar

Abstract

An attempt was made for the effective utilization of iron ore slime in making of geopolymer mortar along with other industrial wastes fly ash and LD-slag and achieved the appreciable compressive strength results with 8 M NaOH after 28 days at a curing period of 24 h at 55°C

    Similar works

    Full text

    thumbnail-image

    Available Versions