Failure Analysis of A 304 SS Girdling Loop of the Boiler in a 500 MW Thermal Power Plant

Abstract

There were many cases of girdling loop failures in the reheater section of the 500 MW boilers of athermal power station after being in service relatively for a short period of a few months. Within seven months of synchron-ization, the bottom 'U'portion of the front reheater girdling loop of the boiler of 500 MW thermal power plant had developed a leak. The plant was restarted alter replacing the failed protion of the type 304 stain-less steel 'U' tube. Failure occurred again within seven months of operation. Similar failures followed in the other units of the station