The control needed in the management of a project was analysed with particular reference to the unique needs of the construction industry within the context of site management. This was explored further by analysing the various problems facing managers within the overall system and determining to what extent the organisation would benefit from an integrated mangement information system. Integration and management of information within the organisational units and the cycles of events that make up the main sub-system was suggested as the means of achieving this objective. A conceptual model of the flow of information was constructed within the whole process of project management by examining the type of information and documents which are generated for the production cycle of a project. This model was analysed with respect to the site managers' needs and the minimum requirements for an overall integrated system. The most tedious and time-consuming task facing the site manager is the determination of weekly production costs, calculation and preparation of interim certificates and valuation of variations occurring during the production stage and finally the settlement and preparation of supplier and sub-contractors' accounts. These areas where microcomputers could be of most help were identified and a number of packages were designed and implemented for various contractors. The gradual integration of stand-alone packages within the whole of the construction industry is a logical sequence to achieve integration of management system. The methods of doing this were analysed together with the resulting advantages and disadvantages