research

UC Berkeley's Cory Hall: Evaluation of Challenges and Potential Applications of Building-to-Grid Implementation

Abstract

From September 2009 through June 2010, a team of researchers developed, installed, and tested instrumentation on the energy flows in Cory Hall on the UC Berkeley campus to create a Building-to-Grid testbed. The UC Berkeley team was headed by Professor David Culler, and assisted by members from EnerNex, Lawrence Berkeley National Laboratory, California State University Sacramento, and the California Institute for Energy & Environment. While the Berkeley team mapped the load tree of the building, EnerNex researched types of meters, submeters, monitors, and sensors to be used (Task 1). Next the UC Berkeley team analyzed building needs and designed the network of metering components and data storage/visualization software (Task 2). After meeting with vendors in January, the UCB team procured and installed the components starting in late March (Task 3). Next, the UCB team tested and demonstrated the system (Task 4). Meanwhile, the CSUS team documented the methodology and steps necessary to implement a testbed (Task 5) and Harold Galicer developed a roadmap for the CSUS Smart Grid Center with results from the testbed (Task 5a) and evaluated the Cory Hall implementation process (Task 5b). The CSUS team also worked with local utilities to develop an approach to the energy information communication link between buildings and the utility (Task 6). The UC Berkeley team then prepared a roadmap to outline necessary technology development for Building-to-Grid, and presented the results of the project in early July (Task 7). Finally, CIEE evaluated the implementation, noting challenges and potential applications of Building-to-Grid (Task 8). These deliverables are available at the i4Energy site: http://i4energy.org/

    Similar works