Análisis y evaluación del plan de expansión del sistema de subtransmisión, considerando el incremento de la demanda por la incorporación de las cocinas de inducción en la EEASA. perteneciente a la provincia de Tungurahua durante el período 2015-2025

Abstract

The current work was developed as a simulation of a plan expansion subtransmission system, taking into account increasing demand for the incorporation of induction cooktops at EEASA, belonging to Tungurahua province, which allows to analyze and evaluate the correct operation of the elements attached to the 69 KV current stage and projected every two years, taking into account the incorporation by stages of the efficient cooking program (ECP). Beginning with the collection of statistical information, which the company has and measurements at the nodo of the substation subtransmission system, obtaining real data that determines the current state and the projected system for the next decade, additionally the flow simulation of power with help of the software "CYMDIST 7.2" was showed....En el presente trabajo de grado se desarrolló del plan de expansión del sistema eléctrico de subtransmisión, considerando el incremento de la demanda por la incorporación de las cocinas de inducción de la EEASA correspondiente a la provincia de Tungurahua, el mismo que permite analizar y evaluar el correcto funcionamiento de los elementos acoplados al sistema de 69 KV en etapa actual y proyectada cada dos años tomando en cuenta la incorporación por etapas del programa de cocción eficiente (PEC). Comenzando con la recopilación de información estadística que posee la empresa y mediciones en las cabeceras de las subestaciones del sistema de subtransmisión...

    Similar works