SHiP Experiment - Comprehensive Design Study report

Abstract

Following the completion of the Comprehensive Design Study of the SHiP detector, this document summarises the status of the physics and the detector and outlines a three-year design and development plan towards Technical Design Reports. The document concludes with an overall road map and updated costs for the detector R&D and construction. With the submission and review of this document, together with the SHiP Progress Report [1] and the Beam Dump Facility Yellow Report [2], the SHiP Collaboration is ready to proceed with the preparation of Technical Design Reports, pending approval

    Similar works