Final report – Loughborough Operational Pilot: Loughborough V2H Operational Pilot Final report with extension of Burton-upon-Trent with V2G application

Abstract

This is the final report of the SEEV4-City Operational Pilot (OP) in Loughborough and its second phase in Burton-upon-Trent, UK. It is part of a collection of reports published by the Smart, clean Energy and Electric Vehicles for the City (SEEV4-City) Project

    Similar works