Design of a Large-Scale Structural System for the 21st Century (Semester Unknown) IPRO 356: DesignOfALarge-ScaleStructuralSystemIPRO356FinalPresentationSp10

Abstract

The main problem which our project faces is what to plan to build in the Michael Reese site, which was recently demolished to make room for the Olympic village. Since Chicago did not win the bid for the 2016 Olympics, the site remains vacant and unused. The basis of the IPRO is to develop a plan for this site, and, specifically, to design a building to serve as an anchor for the area. This anchor building should serve the community while still remaining economical.Deliverable

    Similar works